DBHYDRO       metadata

CITATION INFORMATION

Id Citation Source
1 A T & E Consultants, Inc. 1985. Fort Myers Plant Test Well Program, Fort Myers, Florida. Prepared for Florida Power & Light Company. CONSULTANT
2 AMS. 1990. Hydrogeologic Report for Chiquita Pride Groves. Prepared for Chiquita Gulf Citrus Inc. CONSULTANT
3 Arthur, J.D., C. Fischler, C. Kromhout, J.M. Clayton, G.M. Kelley, R.A. Lee, L. Li, M. O'Sullivan, R.C. Green, and C.L. Werner. 2008. Hydrogeologic Framework of the Southwest Florida Water Management District. Bulletin No. 68. Florida Geological Survey. FLORIDA GEOLOGICAL SURVEY
4 Baldini, S.M. 1998. Romp 13 Tippen Bay Monitor Well Site, Desoto County, Florida, Phase Two, Exploratory Drilling and Monitor Well Construction. Southwest Florida Water Management District, Brooksville, FL. SOUTHWEST FLORIDA WMD
5 Basso, Jr., R.J. 2002. Hydrostratigraphic Zones within the Eastern Tampa Bay Water Use Caution Area. Southwest Florida Water Management District, Brooksville, FL. SOUTHWEST FLORIDA WMD
6 BEM Systems, Inc. and Earthfx Incorporated. 2003. Hydrostratigraphy Review Report for South West Florida Feasibility Study, Developing a Geologic/Hydrostratigraphic Model in Support of the SWFFS-RSM. CONSULTANT
7 Bennett, M. W. Unpublished Log Analysis from Paradise Run ASR. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
8 Bennett, M.W. 1992. (Unpublished data) A Three-Dimensional Finite Difference Ground Water Flow Model of Western Collier County, Florida. Technical Publication 92-04. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
9 Bennett, M.W. 2001. Hydrogeologic Investigation of the Floridan Aquifer System at the I-75 Canal Site, Collier County, Florida. Technical Publication WS-7. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
10 Bennett, M.W. 2001. Hydrogeologic Investigation of the Floridan Aquifer System, L-2 Canal Site, Hendry County, Florida. Technical Publication WS-3. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
11 Bennett, M.W. 2002. Hydrogeologic Investigation of the Floridan Aquifer System, Immokalee Water & Sewer District Wastewater Treatment Plant, Collier County, Florida. Technical Publication WS-14. South Florida Water Management District, West Palm Beach, FL SOUTH FLORIDA WMD
12 Bennett, M.W. 2003. Hydrogeologic Investigation of the Floridan Aquifer System, LaBelle, Hendry County, Florida. Technical Publication WS-15. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
13 Bennett, M.W. 2004. Hydrogeologic Investigation of the Floridan Aquifer System, Big Cypress Preserve, Collier County, Florida. Technical Publication WS-18. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
14 Bennett, M.W. and E.E. Rectenwald. 2002. Hydrogeologic Investigation of the Floridan Aquifer System, Moore Haven Site, Glades County, Florida, Preliminary Report. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
15 Black, Crow and Eidsness Engineers, Inc. 1970. Well Drilling Report, Test Well NA-7, City of Naples. CONSULTANT
16 Black, Crow and Eidsness Engineers, Inc. 1976. Engineering Report, Results of Drilling and Testing Floridan Aquifer Water Supply Wells for the City of Cape Coral, Florida. CONSULTANT
17 Boggess, D.H., T.M. Missimer, and T.H. O'Donnell. 1981. Hydrologic Sections through Lee County and Adjacent Areas of Hendry and Collier Counties, Florida. Open-File Report 81-638. United States Geological Survey, Reston, VA. US GEOLOGICAL SURVEY
18 Bower, R.F., K.M. Adams, and J.I. Restrepo. 1990. (Unpublished data) A Three-Dimensional Finite Difference Ground Water Flow Model of Lee County, Florida. Technical Publication 90-01. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
19 Brown, C.E., R.K. Krulikas, and D.L. Brendle. 1996. Hydrogeologic Assessment of Shallow Clastic and Carbonate Rock Aquifers in Hendry and Collier Counties, Southwestern Florida. Open-File Report 96-556. United States Geological Survey, Reston, VA. US GEOLOGICAL SURVEY
20 Bryan, J.R., R.C. Green and G.H. Means. 2013. An Illustrated Guide to the Identification of Hydrogeologically Important Formations in the South Florida Water Management District. Produced for SFWMD. FLORIDA GEOLOGICAL SURVEY
21 Cardno Entrix. 2012. Useppa Utility Company Completion Report for Class V Exploratory Well EX-1. Prepared for Useppa Utility Company. CONSULTANT
22 CDM. 2003. City of Cape Coral Well 225 Completion Report. CONSULTANT
23 CDM. 2004. South County Water Reclamation Facility Injection Well IW-2 Well Completion Report. CONSULTANT
24 CDM. 2006. City of Clewiston Water Treatment Plant Production Wells PW-1 and PW-2. CONSULTANT
25 CDM. 2007. City of Clewiston Water Treatment Plant Concentrate Injection Well System Well Completion Report, FDEP File No. 249635-001-UC. CONSULTANT
26 CDM/Missimer International, Inc. 2000. Collier County Public Works Southern Reverse Osmosis Wellfield Study, Collier County, Florida. CONSULTANT
27 CH2M HILL. 1989. Drilling and Testing at Williams Little Cypress Farm, Hendry County, FL. Prepared for Williams Farms. CONSULTANT
28 CH2M HILL. 1986. Results of the Reverse Osmosis Injection Well Investigation for the Englewood Water District. UC58-097806. Prepared for the Florid Department of Environmental Regulation, Tallahassee, FL. CONSULTANT
29 CH2M HILL. 1988. Drilling and Testing of the Deep Injection Well System at North Port, Florida. CONSULTANT
30 CH2M HILL. 1989. Engineering Report, Construction and Testing of the Aquifer Storage Recovery (ASR) Demonstration Project for Lake Okeechobee, Florida. Prepared for the South Florida Water Management District, West Palm Beach, FL. CONSULTANT
31 CH2M HILL. 1998. Engineering Report on the Construction and Testing of Artesian Test Production Well TP-1, Fort Myers, Florida. CONSULTANT
32 CH2M HILL. 1998. Lee County Utilities Fort Myers Beach WWTP Deep Injection Well Engineering Report. CONSULTANT
33 CH2M HILL. 1999. Well Completion Report, Potable Water Aquifer Storage Recovery Phase II Drilling and Testing at the San Carlos Estates ASR Site, Bonita Springs, Florida. CONSULTANT
34 CH2M HILL. 2000. Engineering Report on the Construction and Testing of Potable Water Aquifer Storage Recovery at the Winkler Avenue Pumping Station. CONSULTANT
35 CH2M HILL. 2000. The Engineering Report on Testing and Construction of the Key West Deep Injection Well System. CONSULTANT
36 CH2M HILL. 2001. Engineering Report on the Construction and Testing of Production Wells P-3 through P-7, Fort Myers, Florida. CONSULTANT
37 CH2M HILL. 2002. Engineering Report on the Construction and Testing of the Injection Well and Monitoring Well at the Immokalee Water & Sewer District. CONSULTANT
38 CH2M HILL. 2003. Reverse Osmosis WTP Deep Injection Well and Facilities Completion Report. CONSULTANT
39 CH2M HILL. 2004. Collier County Public Utilities Division, Carica Road Pump Station Class V ASR Exploratory Well. CONSULTANT
40 CH2M HILL. 2004. Reverse Osmosis WTP Deep Injection Well and Facilities Engineering Report. CONSULTANT
41 CH2M HILL. 2004. Water Reclamation Facility Deep Injection Well Engineering Report. CONSULTANT
42 CH2M HILL. 2005. Wellfield Completion Report for the Town of Ave Maria, Wells P-1 through P-3. CONSULTANT
43 CH2M HILL. 2007. Engineering Report on the Construction and Testing of Wells P-13 through P-17, Fort Myers, Florida. CONSULTANT
44 CH2M HILL. 2008. Engineering Report on the Construction and Testing of Production Wells P-13 Through P-18. CONSULTANT
45 Clayton, J.M. 1998. Romp 14 Hicoria Final Report - Drilling and Testing Program, Highlands Ridge Water Resource Assessment Project, Highlands County, Florida. Southwest Florida Water Management District, Brooksville, FL SOUTHWEST FLORIDA WMD
46 Connect Consulting, Inc. 2007. Well Completion Report Exploratory Test Well ETW-1, Florida Governmental Utility Authority, Mirror Lakes Water Treatment Plant, Lehigh Acres, Lee County, Florida. CONSULTANT
47 Cunningham, K.J., and D.F. McNeill. 1997. Preliminary Hydrogeologic Analysis of the Sunniland No.1 Core-hole, Collier County, Florida (Final). University of Miami Division of Marine Geology & Geophysics, Rosenstiel School of Marine & Atmospheric Science, Miami, FL. UNIVERSITY
48 Cunningham, K.J., S.D. Locker, A.C. Hine, D. Bukry, J.A. Barron, and L.A. Guertin. 2001. Surface-Geophysical Characterization of Ground-Water Systems of the Caloosahatchee River Basin, Southern Florida. Water-Resources Investigations Report 2001-4084. USGS. US GEOLOGICAL SURVEY
49 Decker, J.L. 1982. Executive Summary, ROMP 28X (YMCA), S17, T37S, R30E, Floridan Aquifer Monitor Project #20-020-5196. Southwest Florida Water Management District, Brooksville, FL. SOUTHWEST FLORIDA WMD
50 Decker, J.L. 1984. Executive Summary, ROMP#15 "Long Island Marsh" Deep Monitor. Southwest Florida Water Management District, Brooksville, FL SOUTHWEST FLORIDA WMD
52 Decker, J.L. 1986. Executive Summary, TR3-3 "Lemon Bay" Charlotte County, Basin 20, S8, T41S, R20E. Southwest Florida Water Management District, Brooksville, FL SOUTHWEST FLORIDA WMD
53 Decker, J.L. 1988. Executive Summary, ROMP 17 "Horse Creek" DeSoto County, Basin 20, S. 14, T. 38S, R. 23E. Southwest Florida Water Management District, Brooksville, FL SOUTHWEST FLORIDA WMD
54 DeWitt, D.J. 1998. Drilling and Testing Report, ROMP 28 Kuhlman, Highlands County, Florida. Southwest Florida Water Management District, Brooksville, FL SOUTHWEST FLORIDA WMD
55 DeWitt, D.J. and D.L. Thompson. 1997. Drilling and Testing Report, ROMP 20 Osprey, Sarasota County, Florida. Southwest Florida Water Management District, Brooksville, FL SOUTHWEST FLORIDA WMD
56 Edwards, L.E., S.D. Weedman, R. Simmons, T.M. Scott, G.L. Brewster-Wingard, S.E. Ishman, and N.M. Carlin. 1998. Lithostratigraphy, Petrography, Biostratigraphy, and Strontium-Isotope Stratigraphy of the Surficial Aquifer System of Western Collier County, Open-File Report 98-205, USGS, Reston, VA. US GEOLOGICAL SURVEY
57 ENSR International. 2003. Wellfield Expansion: Big Cypress Seminole Reservation, Florida Well Construction and Testing Report. Prepared for Winter Environmental Services, Inc. CONSULTANT
58 Entrix Water Solutions. 2009. Technical Memorandum: Site Testing and Supplemental Modeling for a Bank Filtration System at the Seminole Brighton ASR Pilot Project. Prepared for SFWMD. CONSULTANT
59 Entrix. 2010. Construction of Proximal Monitor Well No. 18 (MW-18) Kissimmee River ASR Pilot Site, Okeechobee County, Florida. CONSULTANT
60 Entrix. 2010. Construction of Proximal Monitor Well No. 19 (MW-19) Kissimmee River ASR Pilot Site, Okeechobee County, Florida. CONSULTANT
61 FGS. Lithologic database. Florida Geological Survey, Tallahassee, FL. FLORIDA GEOLOGICAL SURVEY
62 Fish, J.E. and M. Stewart. 1991. Hydrogeology of the Surficial Aquifer System of Dade County, Florida. USGS Water Resources Investigation Report 90(4108):50. U.S. Geological Survey, Tallahassee, FL. US GEOLOGICAL SURVEY
63 Gates, M.T. 1997. ROMP 5 Cecil Webb Monitor Well Site, Charlotte County, Florida, Volume Two, Exploratory Drilling and Testing. Southwest Florida Water Management District, Brooksville, FL. SOUTHWEST FLORIDA WMD
64 Gates, M.T. 1999. ROMP 25 Lily Monitor Well Site, Hardee County, Florida, Phase Two, Exploratory Drilling and Monitor Well Construction. Southwest Florida Water Management District, Brooksville, FL. SOUTHWEST FLORIDA WMD
65 Gates, M.T. 2001. Hydrogeology of the ROMP 16.5 Fort Ogden Monitor Well Site, DeSoto County, Florida, Phase One, Core Drilling and Testing. Southwest Florida Water Management District, Brooksville, FL. SOUTHWEST FLORIDA WMD
66 Gates, M.T. 2001. Hydrogeology of the ROMP 16.5 Fort Ogden Monitor Well Site, DeSoto County, Florida, Phase Two, Deep Exploratory Drilling and Monitor Well Construction. Southwest Florida Water Management District, Brooksville, FL. SOUTHWEST FLORIDA WMD
67 Gates, M.T. 1998. SWFWMD ROMP 9.5 Intermediate Aquifer System Monitor Well Site Desoto County, Florida. Phase I Core Drilling and Testing. SOUTHWEST FLORIDA WMD
68 Giddings, J.B., L.L. Kuebler, J.I. Restrepo, K.A. Rodberg, A.M. Montoya, and H.A. Radin. 2006. DRAFT Lower East Coast subRegional (LECsR) MODFLOW Model Documentation. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
69 Green, R.C., K.M. Campbell, and T.M. Scott. 1990. Core Drilling Project: Lee, Hendry and Collier Counties. Open File Report 37. Florida Geological Survey, Tallahassee, FL. FLORIDA GEOLOGICAL SURVEY
70 Henderson, G.L. 1981. Preliminary Investigation, Core Memorandum-ROMP Site TR1-2. Southwest Florida Water Management District, Brooksville, FL. SOUTHWEST FLORIDA WMD
71 Hendry, C.W. 1959. Geologist's log for well W-4572. FLORIDA GEOLOGICAL SURVEY
72 Hutchinson, C.B. 1992. Assessment of Hydrogeologic Conditions with Emphasis on Water Quality and Wastewater Injection, Southwest Sarasota and West Charlotte Counties, Florida. Water Supply Paper 2371. United States Geological Survey, Reston, VA. US GEOLOGICAL SURVEY
73 Johnson Engineering. 2010. Major General Water Use Permit Application for Public Water Supply for Silver Lake Utilities. Submitted to South Florida Water Management District, West Palm Beach, FL. CONSULTANT
74 Johnson Engineering. 2011. Charlotte County Utilities Babcock Ranch Reserve Well Completion and Testing Report. Prepared for Charlotte County Utilities. CONSULTANT
75 Johnson Engineering, 2012. Individual Water Use Permit Application for Public Water Supply for MSKP Town and Country Utility. CONSULTANT
76 Johnson Engineering. 2008. Town and Country Utilities Well Completion and Testing Report. Prepared for Town and Country Utilities Company, Inc. CONSULTANT
77 Klein, H., M.C. Schroeder, and W.F. Lichtler, 1964. Geology and Ground-water Resources of Glades and Hendry Counties, Florida. FGS Report of Investigations No. 37. FLORIDA GEOLOGICAL SURVEY
78 Knapp, M.S., W. Burns, T. Sharp, and G. Shih, 1984. Preliminary Water Resource Assessment of the Mid and Lower Hawthorn Aquifers in Western Lee County, Florida. Technical Publication 84-10. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
79 Knapp, M.S., W.S. Burns, and T.S. Sharp. 1986. Preliminary Assessment of the Groundwater Resources of Western Collier County, Florida. Technical Publication 86-1. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
80 LaRoche, J.J. 2004. ROMP 35 - West DeSoto, Monitor Well Site, DeSoto County, Florida, Final Report, Exploratory Coring, Monitor-Well Construction, Aquifer Performance Testing. Southwest Florida Water Management District, Brooksville, FL. SOUTHWEST FLORIDA WMD
81 Layne Atlantic Company. 1979. Ground Water Hydrology Study, Green Meadows Analog Model, Florida Cities Water Company, Ft. Myers, Florida. CONSULTANT
82 Lukasiewicz, J., M.P. Switanek, and R.T. Verrastro. 2001. Floridan Aquifer System Test Well Program, City of South Bay, Florida. Technical Publication WS-2. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
83 Manatee Farms? Vanderbuilt/airport; Table 14A-2; Mar 4 1992? CONSULTANT
84 McMillan, C.B., and R.T. Verrastro. 2008. Construction and Testing of an Upper Floridan Aquifer Monitor Well L-63N Canal ASR Site, Okeechobee, Florida. Technical Publication WS-27. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
85 McNabb Hydrogeologic Consulting Inc., and Malcolm Pirnie, Inc. 2009. Report on the Construction and Testing of Deep Injection Well IW-2 at the Charlotte County Utilities Burnt Store Water and Wastewater Treatment Plant. CONSULTANT
86 McNabb Hydrogeologic Consulting Inc., Andreyev Engineering, Inc., and Metzger & Willard, Inc. 2009. Report on the Construction and Testing of Exploratory Well EW-1 and Monitor Well DZMW-1 at the Okeechobee Utility Authority Cemetery Road Wastewater Treatment Facility. CONSULTANT
87 Metcalf & Eddy and Hazen and Sawyer. 2003. Engineering Well Completion Report, South Collier Regional WTP, 8-mgd R.O. Expansion Concentrate Disposal System. CONSULTANT
88 Meyer, F.W. 1988. Summary of well construction, testing, and preliminary findings from the Alligator Alley test well, Broward County, Florida. USGS OFR 87-551. CONSULTANT
89 Miller, J.A. 1988. Geohydrologic Data from the Floridan Aquifer System in Florida and in Parts of Georgia, South Carolina, and Alabama. Open-File Report OFR 88-86. United States Geological Survey, Atlanta, GA. US GEOLOGICAL SURVEY
90 Miller, W.L. 1987. Lithology and Base of the Surficial Aquifer System, Palm Beach County, Florida. Water-Resources Investigations Report WRIR 86-4067. United States Geological Survey, Tallahassee, FL. US GEOLOGICAL SURVEY
91 Missimer and Associates, Inc. 1980. Hydrologic Investigation of the Raw Water Source for Marco Island Utilities, Collier County, Florida. Prepared for Deltona Corp. Sept. 1980. CONSULTANT
92 Missimer and Associates, Inc. 1981. Groundwater Resources of the Bonita Bay Development, Lee County, Florida. CONSULTANT
93 Missimer and Associates, Inc. 1981. Preliminary Hydrogeologic Data for Assessment of the Bonita Bay Development Site. CONSULTANT
94 Missimer and Associates, Inc. 1985. Hydrogeologic Investigation of the Hawthorn and Suwannee Aquifer Systems at Wellfield Cluster Site B, Sanibel Island, Florida. CONSULTANT
95 Missimer and Associates, Inc. 1987. Completion Report for the Collier County Regional Wellfield Expansion at Golden Gates Estates. Prepared for Collier County Utility Dept., September 1997. CONSULTANT
96 Missimer and Associates, Inc. 1991. Water Use Permit Application and Supporting Documentation for Youngquist Brothers, Great Lakes Property, Lee County, Florida. CONSULTANT
97 Missimer and Associates, Inc. 1991. City of Cape Coral Master Water Supply Plan Phase II Report, Hydrogeology and Hydraulic Solute Transport Modeling of the Upper Floridan Aquifer System Beneath Cape Coral, Florida. CONSULTANT
98 Missimer and Associates, Inc. 1991. Phase I - Deep Aquifer Study, Collier County, Florida. Prepared for Collier County Utilities Division. CONSULTANT
99 Missimer and Associates, Inc. 1991. Wellfield Construction, Testing, and Water Use Permit Information for the New GPIWA RO Plant, Pine Island Center, Lee County, Florida. CONSULTANT
100 Missimer and Associates, Inc. 1992. Southern States Utilities, Marco Island Injection Well No. 1, Final Well Completion Report, Volume 2 - Appendices. CONSULTANT
101 Missimer and Associates, Inc. 1992. Southern States Utilities Marco Island Injection Well No. 1 Final Well Completion Report. CONSULTANT
102 Missimer Groundwater Science. 2007. Hydrogeology of Old Corkscrew Plantation with a Mining Impact Analysis, Lee County, Florida. Prepared for Mr. Franz Rosinus. CONSULTANT
103 Missimer Groundwater Science. 2008. Hydrogeology of Troyer Brothers Florida, Inc. with a Mining Impact Analysis, Lee County, Florida. Prepared for Mr. Don Troyer. September 2008. CONSULTANT
104 Missimer Groundwater Science. 2008?. Hydrogeology of FFD IPD Lee County. CONSULTANT
105 Missimer Groundwater Science, a Schlumberger Company. 2007. Seminole Tribe of Florida Brighton Reservation Aquifer Storage and Recovery Exploratory Well Program. CONSULTANT
106 Missimer International, Inc. 1995. Collier County Utilities, Brackish Water Wellfield Study V.1, Collier County, Florida. Prepared for Board of Commissioners Collier County Government. CONSULTANT
107 Missimer International, Inc. 1995. Collier County Utilities Brackish Water Wellfield Study, Collier County, Florida CONSULTANT
108 Missimer International, Inc. 1996. North County Regional Water Treatment Plant Injection Well IW-2 Completion Report. CONSULTANT
109 Missimer International, Inc. 1997. Collier County South County Regional Wastewater Treatment Plant Injection Well IW-1 Completion Report. CONSULTANT
110 Missimer International, Inc. 2000. Final Completion Report for the Deep Well Injection System, IWA RO Concentrate and City of Sanibel Wastewater Effluent. CONSULTANT
111 Missimer, T.M. and T.M. Scott (eds.). 2001. Geology and Hydrology of Lee County, Florida, Durward H. Boggess Memorial Symposium. Special Publication No. 49. Florida Geological Survey, Tallahassee, FL. FLORIDA GEOLOGICAL SURVEY
112 Murray Consultants, Inc. 2008. Impact Analysis, City of Moore Haven, SFWMD CUP #22-00045-W, Glades County. CONSULTANT
113 Murray Consultants, Inc. 2014. Injection Well Project Construction & Testing Report City of Labelle, Labelle, Florida. Prepared for Applied Technology and Management Inc. CONSULTANT
114 MWH. 2002. Interim Report on the Drilling and Testing of the Shell Creek Water Treatment Plant Expanded Aquifer Storage and Recovery (ASR) Well System. Prepared for the City of Punta Gorda, Florida. CONSULTANT
115 MWH. 2003. North Lee County Phase II: Production Well Drilling and Testing Report. CONSULTANT
116 MWH. 2004. North Lee County Water Treatment Plant Class I Injection Well and Dual Zone Monitoring Well Drilling and Testing Report. CONSULTANT
117 MWH. 2006. Three Oaks Wastewater Treatment Plant, Class I Injection Well Drilling and Testing Report. Prepared for Lee County Utilities. CONSULTANT
118 MWH. 2009. Everest WRF Class I Deep Injection Well System, Injection Test Request. CONSULTANT
119 MWH. 2009. IRR-6C.1 Phase I ASR EXW, Horseshoe ASR Exploratory Well Completion Report. CONSULTANT
120 MWH. 2009. IRR-6C.1 Phase II ASR Exploratory Well, Gator Slough Weir 19 ASR Exploratory Well Completion Report. CONSULTANT
121 MWH. 2009. IRR-6C.1 Phase II ASR Exploratory Well, Hermosa Canal ASR Exploratory Well Completion Report. CONSULTANT
122 MWH. 2009. W-2C ASR Exploratory Production Wells, North-South Transfer Station ASR Well System Completion Report. Prepared for the City of Cape Coral, Florida. CONSULTANT
123 MWH. 2009. W-2C North Production Well System, North Wellfield Well Completion Report. Prepared for the City of Cape Coral, Florida. CONSULTANT
124 MWH. 2009. W-7C North Cape Reverse Osmosis Water Treatment Plant and Water Reclamation Facility Class I Deep Injection Well System Drilling and Testing Report. Prepared for the City of Cape Coral, Florida. CONSULTANT
125 MWH. 2009. WW-4C.1 Southwest Plant Class I Deep Injection Well System Drilling and Testing Report. CONSULTANT
126 MWH. 2012. Lee County Regional Solid Waste Disposal Facility Class I Deep Injection Well System Drilling and Testing Report. CONSULTANT
127 PBS&J and CH2M HILL. 2000. Englewood Water District Reclaimed Water ASR Well Construction and Testing Summary at the South Regional WWTP. CONSULTANT
128 PBS&J. 1988. Engineering Report: Deep Test/Injection Well. Prepared for North Fort Myers Utility, Inc. CONSULTANT
129 PBS&J. 1986. Deep-Injection Exploratory/Monitor Well, Atlantic Utilities of Sarasota, Inc. UC58-126969. Prepared for the Florida Department of Environmental Regulation, Tallahassee, FL. CONSULTANT
130 PBS&J. 1986. Engineering Report, Deep-Injection Exploratory/Monitor Well. Prepared for North Fort Myers Utility, Inc. CONSULTANT
131 PBS&J. 1992. Engineering Report, Deep Test/Injection Well, Zemel Road Landfill, Charlotte County, Florida. CONSULTANT
132 PBS&J. 2008. Engineering Report for the Construction and Testing of Lehigh Acres Deep Injection Well. CONSULTANT
133 PBS&J, and Missimer and Associates, Inc. 1978. Hydrology and Geology of a Proposed New Well Field Site in South Lee County, Florida. CONSULTANT
134 Puri, H.S., and G.O. Winston. 1974. Geologic Framework of the High Transmissivity Zones in South Florida Special Publication No. 20. Florida Geological Survey, Tallahassee, FL. FLORIDA GEOLOGICAL SURVEY
135 Reese, R.S., and C.A. Alvarez-Zarikian. 2007. Hydrogeology and Aquifer Storage and Recovery Performance in the Upper Floridan Aquifer, Southern Florida. Scientific Investigations Report SIR 2006-5239. United States Geological Survey, Reston, VA. US GEOLOGICAL SURVEY
136 Reese, R.S., and K.J. Cunningham. 2000. Hydrogeology of the Gray Limestone Aquifer in Southern Florida. USGS Water Resources Investigations Report 99-4213. U.S. Geological Survey, Tallahassee, FL. US GEOLOGICAL SURVEY
137 Reese, R.S., and E. Richardson. 2008. Synthesis of the Hydrogeologic Framework of the Floridan Aquifer System and Delineation of a Major Avon Park Permeable Zone in Central and Southern Florida. USGS Scientific Investigations Report 2007-5207:60. United States Geological Survey, Reston, VA. US GEOLOGICAL SURVEY
138 Reese, R.S., and M.A. Wacker. 2009. Hydrogeologic and Hydraulic Characterization of the Surficial Aquifer System, and Origin of High Salinity Groundwater, Palm Beach County, Florida. Scientific Investigations Report 2009-5113. United States Geological Survey, Reston, VA. US GEOLOGICAL SURVEY
139 Richardson, E., 2010. Unpublished Log Analysis from Paradise Run ASR. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
140 RMA Geologic Consultants, Inc. 2013. Completion Report for Installation of Storage Zone Monitoring Wells MW-4, MW-5, and MW-6 and Retrofitting of the Wellhead of Existing Storage Zone Monitoring Well MW-C for Corkscrew ASR System. Prepared for Lee County. CONSULTANT
142 RMA Geologic Consultants, Inc. 2008. Completion Report for the Club Pelican Bay Reuse Water Aquifer Storage and Recovery System Wells ASR-1 and OZMW-1A, Collier County, Florida. CONSULTANT
143 RMBAKER LLC. 2013. Log Analysis of Well W-14D for C-139 Expansion Project CONSULTANT
144 RMBAKER LLC. 2013. Log Analysis of Well W-4D for C-139 Expansion Project CONSULTANT
145 Schlumberger Water Services. 2008. Advanced Geophysical Logging of Paradise Run Well HIF-42 Summary Report. Prepared for South Florida Water Management District, West Palm Beach, FL. CONSULTANT
146 SFWMD. 2009. Hydrogeologic Assessment of Crooks and Golden Ox Ranches, Hendry County, Florida. Technical Publication WS-28. SOUTH FLORIDA WMD
147 Geddes, Elizabeth, Emily Richardson and Anne Dodd. August, 2015. Hydrogeologic Unit Mapping Update for the Lower West Coast Water Supply Planning Area. SFWMD Technical Publication WS-35. SOUTH FLORIDA WMD
148 SFWMD, Water Use Permitting Files. SOUTH FLORIDA WMD
149 Shaw, J.E., and S.M. Trost. 1984. Hydrogeology of the Kissimmee Planning Area, South Florida Water Management District. Technical Publication 84-1. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
150 Smith, K. 2014 (In Press). Sandstone Aquifer at Lehigh Acres; Maximum Developable Limits. Technical Memorandum. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
151 Smith, K.R., and K. Adams. 1988. Preliminary Assessment of the Groundwater Resource of Hendry County, Florida. Technical Publication 88-12, Parts I and II, DRE-261 and DRE-262. Hydrogeology Division, South Florida Water Management District, West Palm Beach. SOUTH FLORIDA WMD
152 SWFWMD. 1974. Executive Summary ROMP Site No. 11 Core and Monitor Well. SOUTHWEST FLORIDA WMD
153 SWFWMD. 2013. ROMP 8 Warm Mineral Springs Site Summary. SOUTHWEST FLORIDA WMD
154 SWFWMD. 2013. ROMP 12 Prairie Creek Site Summary. SOUTHWEST FLORIDA WMD
155 SWFWMD. 2013. ROMP 14 Hicoria Site Summary. SOUTHWEST FLORIDA WMD
156 SWFWMD. 2013. ROMP 9 Northport Site Summary. SOUTHWEST FLORIDA WMD
157 SWFWMD. 2013. ROMP TR 4-1 Caspersen Beach Site Summary. SOUTHWEST FLORIDA WMD
158 SWFWMD. 2013. ROMP TR1-2 Tropical Gulf Acres Site Summary. SOUTHWEST FLORIDA WMD
159 Thompson, D.L. 1995. Drilling and Testing Report, ROMP 22-Utopia. Southwest Florida Water Management District, Brooksville, FL. SOUTHWEST FLORIDA WMD
160 Unknown. Unknown date. W-51 lithologic log. Okeechobee Company (F.E.C Rwy.). SOUTHWEST FLORIDA WMD
161 Virogroup & CDM. 1994. Completion Report for Lee County Regional Water Supply Authority ASR Test Well #LM-3982, East Lee County, Florida. FLORIDA GEOLOGICAL SURVEY
162 ViroGroup, Inc. 1993. North County Regional Water Treatment Plant Injection Well System Completion Report. Prepared for Collier County Utilities Division. CONSULTANT
163 ViroGroup, Inc. 1995. Completion Report for Burnt Store Utilities Class I Injection Well System, Punta Gorda, Charlotte County, Florida. Prepared for Southern States Utilities. CONSULTANT
164 ViroGroup, Inc. 1997. East Port Water Reclamation Facility Completion Report for IW-2. Prepared for Charlotte County Utilities, Port Charlotte, Florida. CONSULTANT
165 Virogroup, Inc. 1998. Marco Lakes Aquifer Storage and Recovery Pilot Project Final Report. Prepared for Florida Water Services. June, 1998 CONSULTANT
166 Water Resource Solutions, Inc. 2000. Marco Lakes ASR Expansion Project Well Completion Report. CONSULTANT
167 Water Resource Solutions, Inc. 2002. Completion Report for City of Cape Coral Well RO-10A (LM-6617). CONSULTANT
168 Water Resource Solutions, Inc. 2002. Report on Drilling and Testing of the ASR Exploration Well at Pelican Bay Wellfield for Collier County Utilities Engineering Department. CONSULTANT
169 Water Resource Solutions, Inc. 2003. Lower West Coast Potentiometric Mapping Project. Prepared for the South Florida Water Management District, West Palm Beach, FL. CONSULTANT
170 Water Resource Solutions, Inc. 2004. Completion Report for Pinewoods WTP Upper Floridan Aquifer Exploratory and Test Well Drilling. CONSULTANT
171 Water Resource Solutions, Inc. 2004. Marco Lakes ASR Expansion Project ASR-5 Well Completion Report. CONSULTANT
172 Water Resource Solutions, Inc. 2004. North Collier Water Reclamation Facility Well Completion Report for IW-1 and DZMW. CONSULTANT
173 Water Resource Solutions, Inc. 2004. North Collier Water Reclamation Facility Well Completion Report for IW-2. CONSULTANT
174 Water Resource Solutions, Inc. 2005. Berry Groves Test Class V, Group 9, Exploratory Well EXBRY-1, Caloosahatchee River ASR Pilot Project Well Completion Report. CONSULTANT
175 Water Resource Solutions, Inc. 2005. Completion Report for Greater Pine Island Water Association Class I Injection Well System. CONSULTANT
176 Water Resource Solutions, Inc. 2005. Marco Lakes ASR Expansion Project ASR-8 Well Completion Report. CONSULTANT
177 Water Resource Solutions, Inc. 2006. Marco Lakes ASR Expansion Project ASR-6 Well Completion Report. CONSULTANT
178 Water Resource Solutions, Inc. 2007. City of Naples ASR Pilot Study Well Completion Report. CONSULTANT
179 Water Resource Solutions, Inc. 2007. Completion Report for Pinewoods WTP Lower Hawthorn Aquifer Reverse Osmosis Supply Wells RO-2 through RO-5 and Observation Well OW-2, Lee County, Florida. CONSULTANT
180 Water Resource Solutions, Inc. 2007. Feasibility Assessment of Deep Well Injection to Assist in Management of Surface Water Releases from Lake Okeechobee to Estuaries. CONSULTANT
181 Water Resource Solutions, Inc. 2007. Marco Lakes ASR Expansion Project ASR-9 Well Completion Report. CONSULTANT
182 Water Resource Solutions, Inc. 1999. Completion Report for Lee County Utilities Observation Wells #1 (LM-6208) at the North Reservoir Site, Lee County, FL. CONSULTANT
183 Water Resource Solutions, Inc., with Hazen and Sawyer. 2000. Lee County Utilities Observation Wells #1 (LM-6209) and #3 (LM-6615) at the Olga WTP Site, Lee County, Fl. CONSULTANT
184 Wedderburn, L.A, M.S. Knapp, D.P. Waltz, and W.S. Burns. 1982. Hydrogeologic Reconnaissance of Lee County, Florida. Technical Publication 82-1: Parts 1, 2, and 3: DRE-150, DRE-151, and DRE-152. South Florida Water Management District, West Palm Beach, FL. SOUTH FLORIDA WMD
185 Weedman, S.D., F.L. Paillet, G.H. Means, and T.M. Scott. 1997. Lithostratigraphy and Geophysics of the Surficial Aquifer System in Western Collier County, Florida. Open-File Report 97-436. United States Geological Survey, Reston, VA. US GEOLOGICAL SURVEY
186 Schneider, J.J. 1976. Geologic Data From Test Drilling in Palm Beach County, Florida Since 1970. USGS OFR 76-713. US GEOLOGICAL SURVEY
187 Law Environmental, Inc. 1991. Initial Results of Water Supply Evaluation at Squirrel Island Glades County, Florida. Prepared for Lykes Brothers, Inc. CONSULTANT
200 CoreLab, 2009. Core Analysis Report for South Florida Water Management District, OKF-105 Lower Kissimee Basin Field Okeechobee, County, Florida. CONSULTANT
201 LBFH. 2006. The Engineering Report on the Construction and Testing of Deep Injection Well IW-2 for the City of Key West. CONSULTANT
202 CoreLab, 2018. Conventional Plug Analysis Report for South Florida Water Management District, OSF-110 CONSULTANT
203 CoreLab, 2018. Conventional Plug Analysis Report for South Florida Water Management District, OSF-112 CONSULTANT
204 Barnes, Ferland & Associates, Inc. 2009. Aquifer Storage and Recovery Exploratory Well Project Report for Eastern Water Reclamation Facility Orange County, Florida. SJRWMD Contract No. SF410RA. CONSULTANT
205 ARCADIS Inc., November 2013. Construction and Testing Report Orlando Utilities Commission Southeast Monitoring Wells. CONSULTANT
206 CH2M HILL. 1985. Aquifer Storage Recovery Testing Facility Results of Drilling and Testing, prepared for City of Cocoa, Florida. February 1, 1985. CONSULTANT
208 Hazen, January, 2019. Seminole Trive of Florida Hollywood Reservation Deep Injection Well Completion Report. EPA Permit SEA 0001. CONSULTANT
209 WSP | Parsons Brinkerhoff, 2016. Hydrogeology Report and Mining Impact Analysis, Troyer Brothers Florida Inc. Lehigh Acres Farm. CONSULTANT
210 Bennett, Michael W. , Paul F. Linton, E. Edward Rectenwald. 2001. Hydrogeologic Investigation of the Floridan Auifer System Western Hillsboro Basin, Palm Beach County, Florida, Technical Publication WS-8 SOUTH FLORIDA WMD
211 Bennett, Michael W., E.Edward Rectenwald. 2004. Engineering/Well Completion Report Floridan Aquifer System Test/Monitor Well ORF-60, Reedy Creek Improvement District, Orange County, Florida, Technical Publication WS-20 SOUTH FLORIDA WMD
212 Lukasiewicz, John, Dec. 2003. Floridan Aquifer System Test Well Program, L-30N Canal, Miami-Dade Florida, Technical Publication WS-17 SOUTH FLORIDA WMD
213 Lukasiewicz, John, Apr. 2003. Floridan Aquifer System Test Well Program, C-13 Canal, Oakland Park, Florida, Technical Publication WS-16 SOUTH FLORIDA WMD
214 Anderson. Steven D., Sep. 2008. Hydrogeologic Investigation of the Floridan Aquifer System, L-8 (PBF-15), Palm Beach County, Florida, Technical Publication WS-25 SOUTH FLORIDA WMD
215 Richardson, Emily E., Aurora Bouchier, John H. Janzen, Anne Dodd. Sep. 2014. Hydrogeologic Investigation for the Kissimmee Basin Lower Floridan Aquifer Reconnaissance Project, Site C, Osceola County, Florida, Techncial Publication WS-34 SOUTH FLORIDA WMD
216 Richardson, Emily E., John H. Janzen, Elizabeth Geddes, Anne Dodd, Brian Collins. Feb. 2013. Hydrogeologic Investigation for the Kissimmee Basin Lower Floridan Aquifer Reconnaissance Project, Site B, Polk County, Florida. Technical Publication WS-33 SOUTH FLORIDA WMD
217 Sunderland, R. Simon . Sep. 2008. Hydrogeologic Investigation of the Floridan Aquifer System, C-23 Canal Site, Martin County, Florida, Technical Publication WS-24 SOUTH FLORIDA WMD
218 Lukasiewicz, John, Richard Nevulis, Milton Paul Switanek, Robert T. Verrastro. Sep. 2001. Final Report: Floridan Aquifer System Test Well Program at Lake Lytal Park, West Palm Beach, Florida, Technical Publication WS-5 SOUTH FLORIDA WMD
219 Bennett, Michael W., Paul F. Linton, E. Edward Rectenwald. 2004. Hydrogeologic Investigation of the Floridan Auifer System Port Mayaca, Martin County, Florida. SOUTH FLORIDA WMD
220 Bennett, Michael W., 2008. Hydrogeologic Investigation of the Floridan Aquifer System S-65A Site, Osceola County Florida (OSF-104 & OSF-105). Prepared for SFWMD. CONSULTANT
221 Brown, Michael P. and Dennis E. Reece, 1979. Florida Aquifer System of the Upper East Coast Planning Area SFWMD Technical Map Series 79-1 - Plates 1 to 10B, Technical Publication DRE-094 SOUTH FLORIDA WMD
222 Sunderland, R. Simon, Brian Collins, and Steven D. Anderson, 2011. Hydrogeologic Investigation of the Floridan Aquifer System at the S-65C Site (Well OKF-105) Okeechobee County, Florida, Technical Publication WS-32 SOUTH FLORIDA WMD
223 Wedderburn, Leslie A. and Michael S. Knapp, 1983. Field Investigation into the Feasibility of Storing Fresh Water in Saline Portions of the Floridan Aquifer System, St. Lucie County, Florida - Technical Publication 83-7, DRE-175 SOUTH FLORIDA WMD
224 Gates, Michael T., 2006. Hydrogeology of the ROMP 74X Davenport Monitor Well Site, Polk County, Florida SOUTHWEST FLORIDA WMD
225 Horstman, Tiffany, 2011. Hydrogeology, Water Quality, and Well Construction at ROMP 45.5 - Progress Energy Well Site in Polk County, Florida SOUTHWEST FLORIDA WMD
226 Mallams, J.L. and R.A. Lee, 2005. Hydrogeology of the ROMP 29A Sebring Monitor Well Site Report, Highlands County, Florida. SOUTHWEST FLORIDA WMD
227 Rappuhn, Douglas H., 1992. Executive Summary - ROMP 33 / WRAP #6 Waterbury Kibler Agricultural Corporation Property, Manatee County. SOUTHWEST FLORIDA WMD
228 Clayton, James M, 1994. Final Report of Dtilling and Testing Activities ROMP 39 (Oak Knoll) Water Resource Assessment Project, Manatee County, Florida. SOUTHWEST FLORIDA WMD
229 LaRoche, Jason J., 2007. The Geology, Hydrology and Water Quality of the ROMP 43 - Bee Branch Monitor-well Site hardee County, Florida. SOUTHWEST FLORIDA WMD
230 Decker, J.L., 1989. ROMP 49 Balm Park Executive Summary Hillsborough County. SOUTHWEST FLORIDA WMD
231 Decker, J.L., 1988. Executive Sumary ROMP 55 Coca-Cola Foods, Polk County. SOUTHWEST FLORIDA WMD
232 SWFWMD, 2008. Executive Summary ROMP 60 Diesel Road One Monitor Well. SOUTHWEST FLORIDA WMD
233 Arnold, David N. etal., 2013. Well Site Summary ROMP 60 - Mulberry. SOUTHWEST FLORIDA WMD
234 Decker, J.L., 1983. Executive Summary ROMP 90 - Dade City. SOUTHWEST FLORIDA WMD
235 Clayton, James M, 1991. ROMP Dover #1 (Dover Elementary) - Executive Summary. SOUTHWEST FLORIDA WMD
236 Clayton, James M, 2001. WW4 (Weekiwachee Preserve) Final Report - Drilling and Testing Program Northern District Water Resource Assessment Project Hernando County, Florida. SOUTHWEST FLORIDA WMD
237 Barnes, Ferland & Associates, Inc. 2002. Results of Drilling and Testing Orlando Utilities Commission Sky Lake Water Plant Production Well No. 3. CONSULTANT
238 Hydro Designs, Inc., 1990. Floridan Aquifer Wellfield Study Data Collection and Evaluation Report. CONSULTANT
239 Lukasiewicz, John, 1992. A Three Dimensional Finite Difference Ground Water Flow Model of the Floridan Aquifer System in Martin, St. Lucie and Eastern Okeechobee Counties, Florida SFWMD Technial Publication 92-03, DRE-311 SOUTH FLORIDA WMD
240 O'Reilly, Andrew M. and Rick M Spechler, Hydrogeology and Water-Quality Characteristics of the Lower Floridan Aquifer in East-Central Florida, U.S. Geological Survey Water-Resources Investigations Report 02-4193 US GEOLOGICAL SURVEY
241 Reese, R. S., 2014. Hydrogeologic Framework and Geologic Structure of the Floridan Aquifer System and Intermediate Confining Unit in the Lake Okeechobee Area, Florida. U.S. Geological Survey Scientific Investigations Map 3288. US GEOLOGICAL SURVEY
242 Schiner, G.R., C.P. Laughlin and D.J. Toth, 1988. Geohydrology of Indian River County, U.S.G.S. Water-Resources Investigations Report 88-4073 US GEOLOGICAL SURVEY
243 Hickey, John J., 1982. Hydrogeology and Results of Injection Tests at Waste-Injection Test Sites in Pinellas County, Florida, U.S. Geological Survey Water-Supply Paper 2183. US GEOLOGICAL SURVEY
244 Miller, Wesley L. 1987. Lithology and Base of the Surficial Aquifer System, Palm Beach County, Florida. US Geological Survey WRIR-86-4067 US GEOLOGICAL SURVEY
245 Reese, R. S., 1994. Hydrogeology and the Distribution and Origin of Salinity in the Floridan Aquifer System, Southeastern Florida. U.S. Geological Survey Water-Resources Investigations Report 94-4010. US GEOLOGICAL SURVEY
246 Reese, R. S. and Carlos A. Alvarez-Zarikian. 2007. Hydrogeology and Aquifer Storage and Recovery Performance in the Upper Floridan Aquifer, Southern Florida. U.S. Geological Survey Scientific Investigations Report 2006-5239 US GEOLOGICAL SURVEY
247 Hickey, J.J and Wilson, W.E., 1982. Results of Deep Well Injection Testing at Mulberry, Florida. USGS/WRI 81-75. US GEOLOGICAL SURVEY
248 Navoy, A.S., 1986. Hydrogeologic Data from a 2,000 foot Deep core Hole at Polk City, Green Swamp Area, Central Florida. U.S. Geological Survey Water-Resources Investigations Report 84-4257. US GEOLOGICAL SURVEY
249 Broska, J.C. and H.L. Barnette. 1999. Hydrogeology and analysis of aquifer characteristics in west-central Pinellas County, Florida. U.S. Geological Survey Open File Report 99-185. US GEOLOGICAL SURVEY
250 Davis, Jeffery B., SJRWMD Bulk Data Transfer ST. JOHNS RIVER WMD
251 Osburn, William L., SJRWMD Bulk Data Transfer ST. JOHNS RIVER WMD
252 Curtis, Wesley A., SJRWMD Bulk Data Transfer ST. JOHNS RIVER WMD
253 McGurk, B. and P. Fischl Presley. 2002. Simulation of the Effects of Groundwater Withdrawals on the Floridan Aquifer System in East-Central Florida: Model Expansion and Revision. Technical Publication SJ2002-3. St. Johns River Water Management District. Palatka, FL. ST. JOHNS RIVER WMD
254 McGurk, B and John Sego. 1999. Hydrologic Data from a Lower Floridan Aquifer Well, Central Orange County, Florida. Special Publication SJ99-SP8 ST. JOHNS RIVER WMD
255 Davis, J. D., and Boniol, Don, 2011, Grids representing the altitude of top and/or bottom of hydrostratigraphic units for the ECFT 2012 groundwater model area: St. Johns River Water Management District, Bureau of Groundwater Sciences Geographic Information System, Electronic file archives. ST. JOHNS RIVER WMD
256 Missimer and Associates, Inc. 1992. Water Supply Feasibility Testing Program for Okeechobee Beach Water Association, Inc. June, 2002. CONSULTANT
257 Missimer and Associates, Inc. 1992. Technical Memorandum on the Construction and Testing of Well F-2, City of Hollywood, Florida. CONSULTANT
258 MWH, 2009. City of North Miami Beach, Florida, Norwood-Oeffler Water Treatment Plant - Injection Well System; Operation Permit Application UIC Permit 0210044-004-UC. CONSULTANT
259 MWH, 2013. Well Completion Report for Polk Power Station Injection Well IW-1 and Dual-zone Monitor Well DZMW-1. June, 2013. CONSULTANT
260 MWH, 2007. City of Sunrise, Florida; Sawgrass Water Treatment Plant Floridan Blending Test Well. April, 2007. CONSULTANT
261 Meyer, Frederick W. "SALINE ARTESIAN WATER AS A SUPPLEMENT." Journal (American Water Works Association) 63, no. 2 (1971): 65-71. US GEOLOGICAL SURVEY
262 Dames & Moore, 1975. Floridan Aquifer Water Supply Investigation, Turkey Point Area, Dade County Florida. Prepared for Florida Power & Light Company CONSULTANT
263 CH2M HILL. 1995. Feasibility study of a lower east coast aquifer storage and recovery system: Phase I. Prepared for South Florida Water Management District. CONSULTANT
264 Water Resources Solutions, Inc., 2000, Lee County Utilities observation wells #1 (LM-6209) and #3 (LM-6615) at the Olga WTP site, Lee County, Florida: Completion report prepared for Hole, Montes & Associates, Inc., in conjunction with Hazen and Sawyer, P.C., 39 p., 9 apps. CONSULTANT
265 Anderson, Steven D., May, 2011. Construction and Aquifer Testing of the Oak Island Site, Osceola County, Florida. South Florida Water Management District Technical Publication WS-30. SOUTH FLORIDA WMD
266 Richardson, Emily E., John H. Janzen and Julio Beltran. Jan. 2020. Hydrogeologic Investigation at the S61 Locks for Central Florida Water Initiative, Osceola County, Florida, Techncial Publication WS-50. SOUTH FLORIDA WMD
267 Smith, Keith, Emily E. Richardson and John H. Janzen. July 2020. Hydrogeologic Investigation at the C30 canal - Deseret ranch site for Central Florida Water Initiative, Osceola County, Florida, Techncial Publication WS-52. SOUTH FLORIDA WMD
268 AECOM. December, 2012. Engineering Report on the Construction and Testing of the Deep Injection Well System Town of Davie, FL Water Treatment and Water Reclamation Facility CONSULTANT
269 MWH, Stantec. , September 2017. Class I Injection Well Nos. 1 and 2 (CDIIW-1 and 2) and Dual-ZoneMonitor Well No. 1 (CDIDZMW-1) Drilling and Testing Report for theMiami-Dade Water and Sewer Department. CONSULTANT
270 JACOBS, Johnson Engineering, ASRus inc., Oct. 2019. Engineering Report Fort Myers Beach and Fiesta Village WWTPs Reclaimed Water ASR System. Lee County, Florida. CONSULTANT
271 CH2M HILL. 2008.Well Construction and Testing Report: Paradise Run Aquifer Storage and Recovery Test-Monitor Well HIF-42. Prepared for South Florida Water Management District. November, 2008. CONSULTANT
273 Robinson, J.L. 1995. Hydrogeology and results of tracer tests at the old Tampa well field in Hillsborough County, with implications for wellhead-protection strategies in west-central Florida. USGS /WRI 93-4171. US GEOLOGICAL SURVEY
274 ASRUS LLC. APRIL, 2018. CONSTRUCTION AND TESTING of the POLK COUNTY CENTRAL REGIONAL WATER PRODUCTION FACILITY. Prepared for Polk County Utilities. WELL SYSTEM of the POLK COUNTY CENTRAL REGIONAL WATER PRODUCTION FACILITY WELL SYSTEM. 1128 pp. CONSULTANT
275 Richardson, Emily E., Harshit Saini and Daniel Goch. Sept., 2020. Hydrogeologic Investigation at the S65 Locks for the Central Florida Water Initiative Osceola County, Florida Technical Publication WS-55 SOUTH FLORIDA WMD
276 JLA GeosciencesS, FPL OKEECHOBEE CLEAN ENERGY CENTER, AQUIFER PERFORMANCE TESTING REPORT, MAY 22,2017 CONSULTANT
277 McNabb Hydrogeologic Consulting Inc., May 2018. Report on the Construction and Testing of Class V Exploratory Well EW-1 at the Florida Power & Light Company Okeechobee Clean Energy Center. CONSULTANT
279 McNabb Hydrogeologic Consulting Inc., June 2018. Report on the Construction and Testing of Dual-Zone Monitor Well DZMW-1 at the Florida Power & Light Company Okeechobee Clean Energy Center CONSULTANT
280 Hazen and Sawyer, April 2020. Seminole Tribe of Florida Brighton Reservation Deep Injection Well Completion Report EPA Permit SEI 0002 CONSULTANT
281 Schlumberger Water Services USA Inc, 2010 City of Hialeah Reverse Osmosis Water Treatment Plant Injection Wells IW-1 & IW-2 and Dual Zone Monitor Well DZMW-1 Completion Report CONSULTANT
282 Restrepo, J.I., C. Bevier and D. Butler. 1992. A Three-Dimensional Finite Difference Ground Water Flow Model of the Surficial Aquifer System in Broward County, Florida, Technical Publication 92-05, DRE-314 SOUTH FLORIDA WMD
283 Devo Engineering. 2017. Well Completion Report for the Construction and Testing of an Upper Floridan Aquifer Test Well for NED Sunbridge Site Osceola County, FL. CONSULTANT
284 CFWI Hydrologic Analysis Team. 2016. Conceptual model report: East-Central Florida Transient Expanded (ECFTX) Model. Unpublished technical memorandum. Central Florida Water Initiative. April 2016. 68 pp. CENTRAL FL WATER INITIATIVE
285 Williams, L.J. and E.L. Kuniansky. 2015. Revised hydrogeologic framework of the Floridan aquifer system in Florida and parts of Georgia, Alabama and South Carolina. USGS Professional Paper 1807. United States Geological Survey, Reston, VA. 140 pp. 23 pls. US GEOLOGICAL SURVEY
286 PBS&J, 2008. Construction and Testing Report Holly Hill Lower Floridan Aquifer Deep Exploratory Well No. 1. Northeast Regional Utility Service Area Polk County, Florida. CONSULTANT
287 PBS&J, April 2010. CONSTRUCTION AND TESTING REPORT SOUTHEAST POLK COUNTY DEEP EXPLORATORY WELL FROSTPROOF, FLORIDA. CONSULTANT
289 ARCADIS Inc., July, 2004. Construction and Testing Summary Report City of Port St Lucie, Westport Injection Well System, Westport Wastewater Treatment Plant. CONSULTANT
290 Montgomery Watson, Sept. 2998. Stuart Wastewater Treatment Plant Injection Well System Injection Well IW-2 and Monitor Well MW2-2 Drilling and Testing CONSULTANT
291 LBFH. May, 2004. Martin County Utilities Tropical Farms Injection Well System Construction Permit; 0143244-002-UC TFIW-1 Final Casing Seat Recommendation. CONSULTANT
292 Geraghty & Miller. May, 1988. Construction and Testing of an Injection Well North Martin County Area Wastewater Treatment Plant, Jensen Beach, Florida. CONSULTANT
296 Decker, J.L., Jan. 1982. Executive Summary ROMP43XX - Avon Park Floridan Aquifer Monitor Well. SOUTHWEST FLORIDA WMD
297 ASRUS LLC. Aug 2014. ENGINEERING REPORT FOR THE CONSTRUCTION AND TESTING OF THE POLK COUNTY NORTHWEST REGIONAL WASTEWATER TREATMENT FACILITY ASR WELL SYSTEM. CONSULTANT
298 McNabb Hydrogeologic Consulting, Inc, February 2009. Report on the Construction and Testing of Exploratory Well EW-1 and Monitor Well DZMW-1 at the Okeechobee Utility Authority Cemetery Road Wastewater Treatment Facility. CONSULTANT
299 L.S. Sims & Associates, Jan. 2008. Final Coasing Point Report Exploratory Well EW-1, Okeechobee Landfill, Inc., Okeechobee, Florida CONSULTANT
300 JLA Geosciences, Inc., Aug. 2003. Well Completion Report for Floridan Aquifer Wells TFRO-1 throught TFRO-5 at Tropical Farms Water Treatment Plant. CONSULTANT
301 Tetra Tech Inc., Dec. 2008. Tohopekaliga Water Authority Cypress Lake Wellfield Exploratory Test Well Aquifer Performance Testing Report. CONSULTANT
302 Barnes, Ferland and Associates, Inc., 1999. Results of Drilling and Testing Southeast Water Treatment Plant Production Well Nos. I and 2 CONSULTANT
303 Hydro Designs, Inc., Aug 1991. Construction and Testing of a Test/Injection Well at the Rockledge Wastewater Treatment Plant City of Rockledge, Florida. CONSULTANT
304 Gates, M.T., 2011. Hydrogeology, Water Quality, and Well Construction at the ROMP 100 - Clay Sink Well Site in Pasco County, Florida SOUTHWEST FLORIDA WMD
305 Geraghty & Miller. Nov, 1986. Construction and Testing of the Merritt Island Injection Wells Brevard Cuonty, Florida. CONSULTANT
306 Clayton, James M., Nov, 2016. Hydrogeology, Water Quality, and Well Construction at the ROMP 117 Lake Okahumpka Well Site in Northeast Sumter County, Florida SOUTHWEST FLORIDA WMD
307 Fredericks, Jake, Apr. 2011. The Hydrogeology and Water Quality of the ROMP 111.5 - Hampton Prairie Site in Lake County, Florida SOUTHWEST FLORIDA WMD
308 Duncan, J.G., W.L. Evans III, and K.L. Taylor. 1994. Geologic framework of the Lower Floridan aquifer system, Brevard County, Florida. Florida Geological Survey, Bulletin 64. 90 pp. FLORIDA GEOLOGICAL SURVEY
309 Dames & Moore, Sep. 1985, Report Deep Exploratory/Test Injection Well South Beaches Wastewater Treatment Plant for Brevard County, Florida. CONSULTANT
310 LaRoche, Jason J., Feb. 2012, Hydrogeology, Water Quality, and Well Construction at the ROMP 119.5 Ross Pond Well Site in Marion County, Florida. SOUTHWEST FLORIDA WMD
311 MWH, Mar. 2015. Floridan Test Wells FW-1 and FW-2 Construction and Testing Report; Broward County WTP 1A Expansion CONSULTANT
312 JLA Geosciences, Inc., Feb. 2017. FPL Okeechobee Clean Energy Center, Production Well FA-2 Well Completion Report. CONSULTANT
313 Decker, J.L., 1983. Executive Summary ROMP 109 - Old Story Mine. SOUTHWEST FLORIDA WMD
314 New, Greg. 1980. Executive Summary ROMP 113 - Inverness West. SOUTHWEST FLORIDA WMD
315 SWFWMD, 2008. Executive Summary ROMP 116 - Murdock. SOUTHWEST FLORIDA WMD
316 New, Greg. 1981. Executive Summary ROMP 19 - MacArthur Tract SOUTHWEST FLORIDA WMD
317 New, Greg. 1981. Executive Summary ROMP 30 - Zolfo Springs. SOUTHWEST FLORIDA WMD
318 Decker, J.L., 1888. Executive Summary ROMP 44 - Warner Southern College, Polk County. SOUTHWEST FLORIDA WMD
319 Henderson, G.L., 1986. Executive Summary ROMP 57X - Hillcrest Elementary, Polk County. SOUTHWEST FLORIDA WMD
320 Decker, J.L., 1989. Executive Summary ROMP 49 - Balm Park Corehole. SOUTHWEST FLORIDA WMD
321 New, Greg, 1980. Executive Summary ROMP 68 - Antioch McIntosh Road. SOUTHWEST FLORIDA WMD
322 Decker, J.L., 1991. Executive Summary ROMP TR 12-3 - Southern Comfort Blvd. Corehole SOUTHWEST FLORIDA WMD
323 Decker, J.L., 1985. Executive Summary ROMP TR 13-2X - Pinellas Vo. Tech Corehole, Pinellas County. SOUTHWEST FLORIDA WMD
324 Thompson, Donald, Stephanie Baldini, Carl Albury, and Jason LaRoche. 2000. HYDROGEOLGY OF THE ROMP TR 4-1 CASPERSEN BEACH WELLSITE SARASOTA COUNTY, FLORIDA SOUTHWEST FLORIDA WMD
325 New, Greg, 1981. Well Design ROMP TR 5-1 - Laurel Corehole. SOUTHWEST FLORIDA WMD
326 New, Greg. 1981. Executive Summary ROMP TR 7-1 - Bowlees Creek Corehole, Bradenton. SOUTHWEST FLORIDA WMD
327 Decker, J.L., 1989. Executive Summary ROMP TR 7-4 - Ward Lake Corehole, Manatee County. SOUTHWEST FLORIDA WMD
328 DeWitt, D.J., 1982. Executive Summary Addendum ROMP TR 8-1 - Rubonia Corehole, WRAP #2. SOUTHWEST FLORIDA WMD
329 Lee, Richard A., 1986. ROMP TR SA-1 Payne Terminal Drilling and Testing Report Saltwater Interface Monitor-Wellsite Sarasota County, Florida. SOUTHWEST FLORIDA WMD
330 Horstman, Tiffany, 2016. Hydrogeology, Water Quality, and Well Construction at the ROMP 42 Bereah Well Site Polk County, Florida SOUTHWEST FLORIDA WMD
331 TeamONE, Oct 2019. Polk Regional Water Cooperative Combined Projects Implementation Phase I Technical Memorandum SOUTHEAST WELLFIELD WELL COMPLETION REPORT CONSULTANT
332 Richardson, Emily E., Sept., 2014. Hydrogeologic Investigation for the Kissimmee Bason Lower Floridan Aquifer Reconnaissance Project Site B: Addendum. Polk County, Florida. Technical Publication WS-33A SOUTH FLORIDA WMD
333 Lukasiewicz, John and Karin Smith. March, 1996. Hydrogeologic Data and Information Colleted from the Surficial and Floridan Aquifer Systems, Upper East Coast Planning Area, Technical Publication 96-02, WRE-337 SOUTH FLORIDA WMD
334 Bennett, M.W. and E.E. Rectenwald. Dec., 2003. Hydrogeologic Investigation of the Floridan Aquifer System Intercession City, Osceola County, FL Technical Publication WS-23. South Florida Water Management District SOUTH FLORIDA WMD
335 TROST S.M., 1985. FLORIDAN AQUIFER RESOURCE ASSESSMENT, UPPER EAST COAST PLANNING AREA. UNPUBLISHED SFWMD TECHNICAL DATA. South Florida Water Management District. SOUTH FLORIDA WMD
336 Brown, Michael., 1980. Aquifer Recovery Test Data and Analyses for the Floridan Aquifer System in the Upper East Coast Planning Area, Technical Publication 80-1, DRE-107. South Florida Water Management District. SOUTH FLORIDA WMD
337 Shine, M.J., D.G. Padgett, & W.M. Barfknecht, 1989. Groundwater Resource Assessment of Eastern Palm Beach County, Florida - Technical Publication 89-4 - DRE-278. South Florida Water Management District. SOUTH FLORIDA WMD
338 Planert, Michael & Walter R. Aucott. 1985. Water-Supply Potential of the Floridan Aquifer in Osceola, Eastern Orange and Southwestern Brevard Counties, Florida, Water -Resources Investigations Report 84-4135, USGS US GEOLOGICAL SURVEY
339 Anderson, Steven D., May, 2011. Upper Floridan Aquifer Testing Project St. Cloud and River Ranch, Sites Osceola and Polk Counties, Florida, Technical Publication WS-29. South Florida Water Management District SOUTH FLORIDA WMD
340 Westcott, R., 2008. Grain Size Analysis of Sediments form the Kissimmee River Basin. Florida Atlantic University: Center for Environmental Studies. Report for South Florida Water Management District. SOUTH FLORIDA WMD
341 Harvey and others, 2002. Interactions between Surface Water and Ground Water and Effects on Mercury Transport in the North-central Everglades. WRIR 02-4050. U.S. Geological Survey Report US GEOLOGICAL SURVEY
342 Bevier, Cindy & Steven Krupa. May, 2001. Groundwater-Surface Water Interaction in Tree Islands: Water Conservation Area 3, Part 1: Phase 1 Well Installation, Technical Publication WS-4. South Florida Water Management District. SOUTH FLORIDA WMD
343 Geddes, Elizabeth. Aug. 2015. Aquifer Performance Testing The Nature Conservancy Disney Wilderness Preserve Site Polk County, Florida Technical Publication WS-36. South Florida Water Management District. SOUTH FLORIDA WMD
344 Wedderburn, L.A. & M.S. Knapp. 1983. Field Investigations into the Feasibility of Storing Freshwater in Portions of the Floridan aquifer system, St Lucie County, FL. Technical Publication 83-7. South Florida Water Management District SOUTH FLORIDA WMD
345 U.S. Army Corps of Engineers, Jacksonville District. Nov. 2004. Lake Okeechobee Aquifer Storage and Recovery (ASR) Pilot Project, Draft Hydrogeologic Investigation of the Floridan Aquifer System, Kissimmee River Site, Okeechobee County, Florida. ARMY CORPS OF ENGINEERS
346 Lindstrom, Linda. July, 2020. Hydrogeologic Investigation and Aquifer Performance Testing at Morikami Park, Southeastern Palm Beach County, Florida. Technical Publication WS-53. South Florida Water Management District. SOUTH FLORIDA WMD
347 Gefvert, Cynthia, S. Krupa, S. Sunderland, L. Lindstrom, H. Saini, & E. Geddes, IN PRESS. Groundwater-Surface Water Interaction in the St. Lucie Estuary/Indian River Lagoon, Martin and St. Lucie Counties, FL. Technical Publication WS-XX. South Florida Water Management District. SOUTH FLORIDA WMD
348 Janzen, John, S. Sunderland, S. Krupa & C. Gefvert. September 2008. BISCAYNE BAY COASTAL WETLANDS Aquifer Salinity Investigation Technical Publication WS-26. South Florida Water Management District. SOUTH FLORIDA WMD
349 Geraghty & Miller, Inc. 1980. Drilling and Testing at Ellison Wilson Road Well Field Lost Tree Club, North Palm Beach, Florida. CONSULTANT
350 Herr, Jeffrey. 1994. Unpublished Data from Okeechobee County Reconnaisance. SOUTH FLORIDA WMD
351 Fish, J.E. 1988. Hydrogeology, Aquifer Characteristics, and Ground-Water Flow of the Surficial Aquifer System, Broward County, Florida. U.S. Geological Survey Water-Resources Investigations Report 87-4034. US GEOLOGICAL SURVEY
352 Butler, David. February 1999. Well Construction and Geologic Testing along Transects E and F in the S-65A Basin, Kissimmee River System, Florida. Unpublished data collected in support of the Kissimmee River Seepage Study. South Florida Water Management District. SOUTH FLORIDA WMD
353 Butler, David. 1992. Unpublished Aquifer Performance Test data collected in support of Kissimmee groundwater model development. South Florida Water Management District. SOUTH FLORIDA WMD
354 Bennett, M.W. Et al., 2017. Hydrogeologic Investigation of the Floridan Aquifer System: Port Mayaca Site Martin County, Florida. Technical Publication WS-44. South Florida Water Management District. SOUTH FLORIDA WMD
356 Barton, D.C., 2012. Borehole Descriptions from SFWMD Downhole Video Archive; Contract Deliverable to S. Florida Water Management District. CONSULTANT
357 JANZEN, JOHN. 2013. UN-PUBLISHED BOREHOLE DESCRIPTION FROM DOWNHOLE VIDEO AND IMAGE LOG DATA. SOUTH FLORIDA WMD
358 Coonts, Stacey, 2021. Hydrogeologic Investigation at Well OSF-64R for the Central Florida Water Initiative. Technical Publication WS-59. South Florida Water Management District. SOUTH FLORIDA WMD
359 McNabb Hydrogeologic Consulting, Inc., September 2012. Report on the Construction and Testing of Class V Exploratory Well EW-1 at the Florida Power & Light Company Turkey Point Units 6 & 7 CONSULTANT
361 Hartman and Associates, Inc., 2002. City of Naples East Golden Gare Wellfield Testing and Monitoring. Prepared for the City of Naples. CONSULTANT
362 MWH 2010. CANAL PUMP STATION 2 ASR WELL SYSTEM COMPLETION REPORT. PREPARED FOR THE CITY OF CAPE CORAL. CONSULTANT
363 MWH 2009. Canal Pump Station 4 ASR Well System Completion Report. Prepared for the City of Cape Coral. CONSULTANT
364 MWH, 2007.Southwest Wellfield Expansion Well Completion Report. Prepared for the Coty of Cape Coral. CONSULTANT
365 URS, 2010. C-139 Regional Feasibility Study Field Data Technical Memorandum (Final). CONSULTANT
366 Geraghty and Miller, 1983.Groundwater Resources at Port LaBelle, Glades and Hendry Counties, Florida. Prepared for the Village of Port LaBelle, General Development Corporation. CONSULTANT
367 Smith, Keith, Stacey Coonts, Harshit Saini and Emily Richardson. (In Press). Hydrogeologic Investigation at the Sumica Nature Preserve for the Central Florida Water Initiative Osceola County, Florida Technical Publication WS-## SOUTH FLORIDA WMD
368 CH2MHill, 2002. Reverse Osmosis WTP Deep Injection Well and Facilities Engineering Report. Prepared for Gasparilla Island Water Association. CONSULTANT
369 Water Resource Solutions, Inc,. 2000. City of Punta Gorda Exploration/Dual Zone Monitoring Well Project Well Completion Report Volume 1. CONSULTANT
370 Water Resources Solutions, Inc. City of Punta Gorda Exploration/Dual Zone Monitoring Well Project Well Completion Report Volume III Appendices. CONSULTANT
371 JLA Geosciences, Inc., 2021. Summary Report 4/22/2021 - L31N Seepage Barrier CONSULTANT
372 Golder Associates. December 28, 2020. L-31N Borehole Geophysical Logging Summary Report. CONSULTANT
373 CH2MHill, 2004. LAKE Okeechobee Aquifer Storage & Recovery (ASR) Pilot Project Hydrogeologic Investigation of the Floridan Aquifer System Kissimmee River Site Okeechobee County, Florida. Prepared in Cooperation with the South Florida Water Management District. CONSULTANT
374 Golder Associates, 2007. Lake Okeechobee Aquifer Storage and Recovery (ASR) Regional Project Site Characterization Report Construction of Single-Zone Monitor Well MW0010 and Groundwater Sampling Site 2 (Kissimmee River Site) Okeechobee County, Florida. Prepared for the U.S. Army Corps of Engineers Jacksonville District. CONSULTANT
375 McNabb Hydrogeologic Consulting, Inc., 2018. Report on the Construction and Testing of Class I Injection Well IW-2 at the Florida Power & Light Company Okeechobee Clean Energy Center. CONSULTANT
376 JLA Geosciences, Inc., 2017. FPL Clean Energy Center, Production Well FA-6 (SJRWMD Well ID 455803), Well Completion Report. CONSULTANT
377 JLA Geosciences, Inc, 2017. FPL Clean Energy Center, Monitor Well MW-1 (SJRWMD Well ID 465057), Well Completion Report. CONSULTANT
378 Atkins, 2012. Engineering Report for the Construction and Testing of the City of Sarasota Deep Injection Well System. CONSULTANT
379 Zydek, Julia, 2016. Well Construction at the ROMP 122 - Rutland Well Site in Sumpter County, Florida. Southwest Florida Water management District. SOUTHWEST FLORIDA WMD
380 Boyle Engineering, 1995. Hydrogeologic Report Southern Regional Wellfield. Prepared for the Orange County Public Utilities Division. CONSULTANT
381 CH2MHill, 1990. Results of Aquifer Storage and Recovery (ASR) Well Drilling and Testing. Prepared for the City of Cocoa, Florida. CONSULTANT
382 Boyle Engineering Corporation, 2008. Deep Injection Well System Engineering Report Volume I, Tropical Farms Deep Injection Well System. Prepared for Martin County Utilities. CONSULTANT
383 JLA Geosciences, Inc., 2014. Well Construction and Testing Report for Surficial Aquifer Replacement Wells PBG-11B, PBG-5A, PBG-12A, NPB-1B, NPB-2B, & NPB-8B. Prepared for Seacoast Utility Authority and Holtz Consulting Engineers, Inc. CONSULTANT
384 Hazen and Sawyer, 2009. South Central Regional Wastewater Treatment and Disposal Board Well Completion Report for the Deep injection Well System. CONSULTANT
385 JLA Geosciences, Inc., 2013. Well Construction and Testing Report for Surficial Aquifer Production Wells NPB-5C, NPB-6B, BR-22B, & BR-25B. Prepared for Seacoast Utility Authority and Holtz Consulting Engineers, Inc. CONSULTANT
386 Mock, Roos & Associates, Inc., 2009. Report on the Construction and Testing of Replacement Dual-Zone Monitor Well MW-5R at the East Central Regional Water Reclamation Facility. Prepared for the City of West Palm Beach. CONSULTANT
387 CDM, Inc., 1985. Well Field Evaluation and New Well Site Location Study for the City of Coral Springs, Florida. CONSULTANT
388 Vukovic, Milan & Andjelko Soro. 1992. Determination of Hydraulic Conductivity of Porous Media From Grain Size Compositions. Water Resources Publications. CONSULTANT
389 JLA Geosciences, Inc, 2020. Report on Construction and Testing of FA-1, Stuart, FL CONSULTANT
390 STANTEC, 2022. LAKE OKEECHOBEE WATERSHED RESTORATION PROJECT (LOWRP) AQUIFER STORAGE AND RECOVERY WELLS CONTINUOUS CORING PROGRAM AT L-63N CONSULTANT
391 ARCADIS INC., 2015. MECCA FLOW EQUALIZATION BASIN DESIGN DOCUMENTATION REPORT TASK 2.1  GEOTECHNICAL INVESTIGATIONS, SUBTASK 2.1.1  DATA REPORTING DELIVERABLE 2.1.1.2  GEOTECHNICAL DATA REPORT CONSULTANT
392 SCS Engineers, Inc, 2018. Countyline 2 LLC Class I Injection Well System - IW-1 and DZMW-1 Completion Report CONSULTANT
393 L. S. Sims & Associates, 2016. Medley Landfill injection Well Final Report. CONSULTANT
394 Murray Consultants, Inc. 2013. PUBLIC WATER SUPPLY WELL UFA-2 CONSTRUCTION REPORT CITY OF LABELLE LABELLE, FLORIDA CONSULTANT
395 Schlumberger Water Services USA Inc 2015 , Well Construction and Testing Report, Seminole Brighton Upper Floridan Aquifer Wells: UFA-1 and UFA-2 CONSULTANT
396 Radise, Inc., 2017. Preliminary Design Final Geotechnical Report. Picayune Strand Restoration Project Southwest Protection Feature CONSULTANT
397 Missimer & Associates, 1991. Summary Analysis of Hydrogeologic Impacts Resulting From Mining and Water Production at the Southfield Farm (Dude Pit) Excavation Project. CONSULTANT
398 Missimer & Associates, 1980. Groundwater Resources of the Shamrock County Club Development, Collier County, Florida CONSULTANT
399 Missimer & Associates, 1980. Groundwater Resources if the Quail Creek Country Club Development, Collier County, Florida CONSULTANT
400 PBS &J, Inc. 1978. Hydrology and Geology of a Proposed New Wellfield Site in North Collier County, Florida CONSULTANT
401 Missimer & Associates, 1978. Hydrology and Water Management: The Glades Development CONSULTANT
402 Missimer & Associates, 1981. Hydrologic Investigation of the Silver Strand Groves Site CONSULTANT
403 Missimer & Associates, 1987. US Sugar Corporation Southern Division Groves Phase III Aquifer Test Supplemental Data CONSULTANT
404 Missimer & Associates, 1981. Groundwater Resources of the Bonita Bay Development, Lee County, Florida: Volumes 1 and 2 CONSULTANT
405 Missimer & Associates, 1990. Results of Exploratory and Test Well Drilling Program, Pelican Landing Ridgewood Development, Bonita Springs, Florida CONSULTANT
406 PBS & J Inc, 1978. Hydrology and Geology of a Proposed New Well Field Site in South Lee County, Florida CONSULTANT
407 Water Science Associates, 2022. Report of Test Borings for Audubon Corkscrew Swamp Sanctuary CONSULTANT
408 Missimer & Associates, 1984. Aquifer Performance Testing at the Gateway Development Lee County, Florida CONSULTANT
409 Missimer & Associates, 1983. Shallow Aquifer Testing for Florida Power & Light Fort Myers Facility CONSULTANT
410 CH2MHill, 1984. Test production well investigations to determine recharge potential of Tampa Bypass Canal CONSULTANT
411 Challenge Engineering &Testing Inc, 2007. Lake Okeechobee ASR Pilot Project Okeechobee and Martin Counties Florida. Contract #W912EP-05-D-0010, delivery order #8 CONSULTANT
412 CH2MHill, 2007. Engineering Report on the Construction and Testing of Wells P-13 through P-17 Fort Myers, Florida. CONSULTANT
413 Missimer & Associates, 1986. Citrus Park RV Resort Groundwater Monitoring Plan Data Submittal, Lee County, Florida CONSULTANT
414 Missimer & Associates, 1985. Hydrogeologic Investigation of Libby's Section 22. CONSULTANT
415 Missimer & Associates, 1981. Hydrologic Investigation for the Everglades City Raw Water Supply, CONSULTANT
416 Missimer & Associates, 1990. Safe Yield Determination by Three-Dimensional Hydraulic Modeling of the Lower Tamiami Aquifer Beneath Golden Gate Estates, Collier County, Florida. CONSULTANT
417 Palm Beach County Water Utilities Department WTP#9 Hillsboro Canal Wellfield Well Completion Report, 2004. CONSULTANT
418 HAZEN & SAWYER, 2010. CITY OF NAPLES WELL COMPLETION REPORT FOR AQUIFER STORAGE AND RECOVERY WELL NO. 1 CONSULTANT
419 Hazen & Sawyer, 2011. City of Naples Well Completion Report for Aquifer Storage and Recovery Well No. 2 CONSULTANT
420 Hazen & Sawyer, 2014. City of Naples Well Completion Report for Aquifer Storage and Recovery Well No. 3 CONSULTANT
421 Stantec, 2023. Lake Okeechobee Watershed Restoration Project Aquifer Storage and Recovery Wells Continuous Coring Program at L-63S CONSULTANT
422 MWH, 2009. W-2C Production Wells. Replacement Well Completion Report CONSULTANT

Query returned 399 record(s).

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?