Notes |
Upon completion of Stormwater Treatment Area 1 West, this location became associated with the STA seepage return canal. As of April 7, 2014, Water Quality has moved the sampling location associated G250S (ENR002) from the wooden HW platform to the headwater side of the Seepage Control structure. The wooden platform was in bad shape, so sampling will occur from the structure from now on. |