Notes |
This pump station once known by some as G-200A, at the Miami Canal (L-23), and shown as such on original as-built drawings is effectively G-200 because the seepage pumps (G-200B on as-builts) had a limited lifespan. The Miami Canal connection to the NW corner of the Holey Land was discontinued in 2010 and resumed in 2014 with the rebuild of the G-200 (once G-200A) pump station. |