DBHYDRO       reports

Construction Details Report

Well NameAIR19W2
DescriptionAIR 19 GW SITE (DEEP WELL) NR OUC SUBSTATION 19 [ORANGE TEST WELL]
Latitude [NAD83]282411.8
Longitude [NAD83]812113.6
FL State Plane East [NAD83]542434.662
FL State Plane North [NAD83]1479493.449
CountyOrange
Land Surface Elev. [NGVD29]84.8
Elevation SourceSURVEY
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]2000
Completion Date01-MAR-1996
Hole Diameter8
Well Owner
Driller Name
Drilling Method
Construction Comments
Construction Date01-MAR-1996
Destroy Date
Drilling Comments5/22/12 - VIDEO LOGGING FOUND OBSTRUCTION AT CASING TRANSITION AT 150 FEET; VIDEO COULD NOT ADVANCE BUT CALIPER ADVANCED TO TD.
Development Method
Development Hours
General CommentsTHIS IS THE DEEP WELL AT SITE AIR19 WHICH WAS ORIGINALLY REGISTERED AS A SINGLE WELL, AIR19_G, ALONG WITH AIR19W1 DUPLICATE REGISTRATION - ORANGE-TW MERGED 9/24/15



Page generated at: 04-OCT-2025 11:42 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?