DBHYDRO       reports

Construction Details Report

Well NameBF-1
DescriptionPILOT HOLE AND LOWER FLORIDAN WELL - AT THE S-36 S.C. STRUCTURE
Latitude [NAD83]261024.217
Longitude [NAD83]801042.375
FL State Plane East [NAD83]925617.304
FL State Plane North [NAD83]669564.23
CountyBroward
Land Surface Elev. [NGVD29]9.38
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]2280
Completion Date01-DEC-1992
Hole Diameter4
Well OwnerSOUTH FLORIDA WATER MANAGEMENT DISTRICT
Driller NameRST INC
Drilling MethodREVERSE ROTARY
Construction Comments
Construction Date01-JAN-1992
Destroy Date
Drilling CommentsWS-15 TECH PUB (IN DRAFT AS OF OCT 2002) SUMMARIZES THE EVENTS
Development Method
Development Hours
General CommentsTHE FIRST PILOT WELL CONSTRUCTED AT THE SITE. BOTTOM 200 FEET OF OPEN HOLE BACK FILLED WITH PEA-GRAVEL UPON COMPLETION OF WELL, TD NOW 2080. DUAL INDUCTION LOG MADE IT TO TD OF 2280 BLS, REMAINING GEOPHYSICAL LOGS BRIDGED AT 2150' BLS CUTTINGS COLLECTION STARTED AT 30' BLS TECH PUBLICATION DOCUMENTING FINDINGS IN DRAFT FORM- LUKASIEWICZ



Page generated at: 04-OCT-2025 05:01 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?