DBHYDRO       reports

Construction Details Report

Well NameCNTYLN-IW1
DescriptionCountyline 2 LLC Injection Well
Latitude [NAD83]255457.99
Longitude [NAD83]802156.03
FL State Plane East [NAD83]864699.507
FL State Plane North [NAD83]575705.587
CountyMiami-Dade
Land Surface Elev. [NGVD29]
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]3500
Completion Date06-APR-2022
Hole Diameter
Well OwnerCountyline 2 LLC
Driller NameLayne
Drilling Method
Construction Comments8.625-inch FRP set inside 12-inch steel casing with a packer at 3020 feet bls.
Construction Date17-OCT-2017
Destroy Date
Drilling Comments
Development Method
Development Hours
General Comments



Page generated at: 04-OCT-2025 06:54 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?