DBHYDRO       reports

Construction Details Report

Well NameFTM_RO-P1
DescriptionCITY OF FT. MYERS WTP RO PRODUCTION WELL P1
Latitude [NAD83]263743.283
Longitude [NAD83]814931.802
FL State Plane East [NAD83]386484.634
FL State Plane North [NAD83]835072.015
CountyLee
Land Surface Elev. [NGVD29]23.86
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]1150
Completion Date06-FEB-1998
Hole Diameter22
Well OwnerCITY OF FORT MYERS
Driller NameYOUNGQUIST BROTHERS, INC.
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling CommentsMUD ROTARY USED TO DRILL THROUGH SURFICIAL AQUIFER AND CLAY INTERVALS. REVERSE AIR TECHNIQUES WERE USED TO DEPTH OF 1150 FT BLS.
Development Method
Development Hours
General CommentsWELL WAS ORIGINALLY NAMED TP-1 WHEN CONSTRUCTED IN 1998 BUT CHANGED TO P-1 WHEN FINAL CASING WAS MODIFIED FROM 24 INCH STEEL TO 16 INCH PVC IN AUGUST 2000.



Page generated at: 04-OCT-2025 06:37 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?