Well Name | GLF-6 |
Description | GROUNDWATER MONITORING WELL AT S77 ON CALOOSAHATCHEE RIVER IN MOORE HAVEN |
Latitude [NAD83] | 265018.722 |
Longitude [NAD83] | 810507.402 |
FL State Plane East [NAD83] | 628323 |
FL State Plane North [NAD83] | 910488 |
County | Glades |
Land Surface Elev. [NGVD29] | 16.32 |
Elevation Source | SURVEY |
Elevation Error [ft] +/- | |
Land Surface Elev. [NAVD88] | 15 |
Total Depth [FT BLS] | 2023 |
Completion Date | 12-JUL-2022 |
Hole Diameter | |
Well Owner | SOUTH FLORIDA WATER MANAGEMENT DISTRICT |
Driller Name | DIVERSIFIED DRILLING CORP. |
Drilling Method | |
Construction Comments | |
Construction Date | |
Destroy Date | |
Drilling Comments | |
Development Method | |
Development Hours | |
General Comments | FRANCIS FLORES AND ED MARKS
CUTTINGS BAGGED IN FIVE-FOOT INTERVALS
WELL FOR MONITOR AND TEST INJECTION
MISSING SAMPLE INTERVALS: 365-370, 905-910, 985-1005, 1190-1195,
1300-1320, 1395-1603, 1985-1990, 2010-2015.
CAVITY: 1631-1664, UNWASHED: 0-1605, WASHED: 1605-2030. |