DBHYDRO       reports

Construction Details Report

Well NameHHRO-TP1
DescriptionCITY OF HIALEAH, HIALEAH HEIGHTS RO TEST PRODUCTION WELL
Latitude [NAD83]255527
Longitude [NAD83]802211
FL State Plane East [NAD83]863316.78
FL State Plane North [NAD83]578626.707
CountyMiami-Dade
Land Surface Elev. [NGVD29]5
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]1747
Completion Date06-JUN-2009
Hole Diameter17.4
Well OwnerCITY OF HIALEAH
Driller NameFestus, Diversified Drilling 239 368 6404
Drilling MethodMUD ROTARY
Construction CommentsGEOLOGIC FORMATION SAMPLES WERE COLLECTED AND DESCRIBED DURING PILOT HOLE DRILLING.
Construction Date06-JUN-2009
Destroy Date
Drilling CommentsREVERSE AIR DRILLING USED BELOW 1180' BLS.
Development MethodC
Development Hours8
General CommentsSchlumberger Water Services and Diversified Drilling constructed well as part of a pilot study for the City of Hialeah; well was developed by jetting thru bit and pumping between 1000 and 1400 gpm, < 1mL of sand in first 12 hours of APT.



Page generated at: 04-OCT-2025 10:14 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?