DBHYDRO       reports

Construction Details Report

Well NameMO-178
DescriptionTRAIL CENTER CORE
Latitude [NAD83]254815.93
Longitude [NAD83]805230.17
FL State Plane East [NAD83]697276.566
FL State Plane North [NAD83]534629.264
CountyMonroe
Land Surface Elev. [NGVD29]10
Elevation SourceUNKNOWN
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]465
Completion Date16-APR-2025
Hole Diameter2
Well OwnerUSGS
Driller NameUSGS
Drilling MethodMUD ROTARY
Construction Comments
Construction Date
Destroy Date
Drilling CommentsMETHOD OF CONSTRUCTION ACCORDING TO USGS - MUD IS PUMPED DOWN INSIDE A ROTATING DRILL STEM AND BIT, CUTTINGS AND MUD MOVE UP OUTSIDE THE STEM
Development Method
Development Hours
General CommentsDATA COMES FROM USGS NWIS MONROE DATA HOLE DEPTH: 465 FT BLS WELL DEPTH: 452 FT BLS



Page generated at: 04-OCT-2025 03:57 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?