DBHYDRO       reports

Construction Details Report

Well NameNLCPW-11
DescriptionNorth Lee County WTP Supply Well PW-11
Latitude [NAD83]264332.648
Longitude [NAD83]814835.456
FL State Plane East [NAD83]391821.983
FL State Plane North [NAD83]870316.783
CountyLee
Land Surface Elev. [NGVD29]
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]12.3
Total Depth [FT BLS]748
Completion Date15-NOV-2010
Hole Diameter16
Well OwnerLEE COUNTY UTILITIES
Driller NameRoss - Diversified Drilling Corporation
Drilling MethodMUD ROTARY
Construction CommentsGEOLOGIC FORMATION SAMPLES WERE COLLECTED AND DESCRIBED AT 5-FOOT INTERVALS DURING THE PILOT HOLE AND OPEN-HOLE DRILLING.
Construction Date15-NOV-2010
Destroy Date
Drilling CommentsMUD ROTARY DRILLING TO CASING SETTING DEPTH (538'). REVERSE AIR DRILLING USED SUSEQUENTLY TO TOTAL DEPTH.
Development MethodC
Development Hours12
General Comments



Page generated at: 04-OCT-2025 08:39 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?