DBHYDRO       reports

Construction Details Report

Well NameNLCPW-16A
DescriptionNorth Lee County WTP Supply Well PW-16A
Latitude [NAD83]264309.224
Longitude [NAD83]814815.725
FL State Plane East [NAD83]393596.05
FL State Plane North [NAD83]867940.119
CountyLee
Land Surface Elev. [NGVD29]10.8
Elevation SourceSFWMD GIS
Elevation Error [ft] +/-.656
Land Surface Elev. [NAVD88]9.65
Total Depth [FT BLS]680
Completion Date15-NOV-2010
Hole Diameter16
Well OwnerLEE COUNTY UTILITIES
Driller NameRoss - Diversified Drilling Corporation
Drilling MethodMUD ROTARY
Construction CommentsGEOLOGIC FORMATION SAMPLES WERE COLLECTED AND DESCRIBED AT 5-FOOT INTERVALS DURING THE PILOT HOLE AND OPEN-HOLE DRILLING.
Construction Date15-NOV-2010
Destroy Date
Drilling CommentsMUD ROTARY DRILLING TO CASING SETTING DEPTH (542'). REVERSE AIR DRILLING USED SUSEQUENTLY TO 680', WELL BACKPLUGGED TO 667'.
Development MethodC
Development Hours10
General Comments



Page generated at: 28-SEP-2024 21:32 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?