DBHYDRO       reports

Construction Details Report

Well NamePB-1186
DescriptionBELLE GLADE WASTE DISPOSAL INJECTION WELL, PALM BEACH CO.
Latitude [NAD83]264143.243
Longitude [NAD83]804122.211
FL State Plane East [NAD83]757541.77
FL State Plane North [NAD83]858553.162
CountyPalm Beach
Land Surface Elev. [NGVD29]14.1
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]3505
Completion Date10-JUN-1990
Hole Diameter
Well OwnerCITY OF BELLE GLADE
Driller NameASSAY INC
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsCUTTING DESCRIBED BY: STEVE CAMPBELL, JOEL DUNCAN (OCTOBER, 1993) CORE #1--#7 DESCRIBED BY LI LI (08/10/94) UTM COORD. X=530952; Y=2952512. THE PICK FOR THE BASE OF THE AVON PARK-TOP OF THE OLDSMAR IS QUESTIONABLE, AND IS MAINLY MADE ON A CHANGE IN LITHOLOGY. GEOPHYSICAL CHARACTERISTICS SUGGEST THE CONTACT MAY BE APPROXIMATELY 50' LOWER. THE ANHYDRITE IN THE BOTTOM OF THE WELL IS CONSIDERED TO REPRESENT CEDAR KEYS FORMATION BECAUSE OF THE MASSIVE NATURE OF THE DEPOSIT IN THE BOTTOM 20'.



Page generated at: 04-OCT-2025 03:56 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?