DBHYDRO       reports

Construction Details Report

Well NamePB-1551
DescriptionUSGS SITE 14
Latitude [NAD83]265135.221
Longitude [NAD83]801726.178
FL State Plane East [NAD83]887448.82
FL State Plane North [NAD83]918849.224
CountyPalm Beach
Land Surface Elev. [NGVD29]23
Elevation Source
Elevation Error [ft] +/-1
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]130
Completion Date16-JUL-1986
Hole Diameter9
Well OwnerGEOLOGICAL SURVEY
Driller NameDUAL TUBE
Drilling MethodOTHER
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsAutomated well construction update from USGS NWIS Database on (12-10-2004)



Page generated at: 04-APR-2025 15:02 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?