DBHYDRO       reports

Construction Details Report

Well NamePB-1558
DescriptionUSGS SITE 12
Latitude [NAD83]264835.228
Longitude [NAD83]801933.181
FL State Plane East [NAD83]876043.24
FL State Plane North [NAD83]900611.495
CountyPalm Beach
Land Surface Elev. [NGVD29]20
Elevation Source
Elevation Error [ft] +/-1
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]190
Completion Date22-JUL-1986
Hole Diameter6
Well OwnerGEOLOGICAL SURVEY
Driller NameDUAL TUBE
Drilling MethodOTHER
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsAUTOMATED WELL CONSTRUCTION UPDATE FROM USGS NWIS DATABASE ON (01-14-2003) DESCRIBED BY JOY GRIFFIN 1/98



Page generated at: 28-SEP-2024 19:18 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?