DBHYDRO       reports

Construction Details Report

Well NamePB-1620
DescriptionHOWDI:262204080102301
Latitude [NAD83]262101.6
Longitude [NAD83]801022.9
FL State Plane East [NAD83]926980.547
FL State Plane North [NAD83]733932.058
CountyPalm Beach
Land Surface Elev. [NGVD29]16
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]20
Completion Date
Hole Diameter3
Well OwnerGEOLOGICAL SURVEY
Driller NameUSGS
Drilling MethodCABLE TOOL
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsAUTOMATED WELL CONSTRUCTION UPDATE FROM USGS NWIS DATABASE ON (12-10-2004). REFERENCE ELEVATION AT TOP OF CASING, FROM JULY 2005 SURVEY.



Page generated at: 04-APR-2025 15:00 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?