DBHYDRO       reports

Construction Details Report

Well NamePB-1804
DescriptionLEC CONTINUOUS CORE @ S-6 PUMP STATION
Latitude [NAD83]262822.2
Longitude [NAD83]802648.7
FL State Plane East [NAD83]837115.165
FL State Plane North [NAD83]777941.009
CountyPalm Beach
Land Surface Elev. [NGVD29]12
Elevation SourceUSGSTOPO
Elevation Error [ft] +/-2
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]230
Completion Date02-AUG-2006
Hole Diameter4
Well OwnerSFWMD
Driller NameBRIAN MCCORD/ US DRILLING- GFA
Drilling Method
Construction CommentsSPT SAMPLE INTERVAL OF 2' FROM 0 TO 200' AND CUTTINGS SAMPLE INTERVAL OF 5 FT FROM 200' TO 230'; MANY INTERVALS WERE BY MUD ROTARY BECAUSE OF REFUSAL
Construction Date02-AUG-2006
Destroy Date
Drilling CommentsMANY INTERVALS WERE DRILLED BY MUD ROTARY BECAUSE OF SPT REFUSAL
Development Method
Development Hours
General Comments



Page generated at: 04-OCT-2025 06:37 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?