DBHYDRO       reports

Construction Details Report

Well NameW-15961
DescriptionWEST MELBOURNE INJECTION WELL DRILLER: ALSAY INC. [PROSPECT #GN8762.8]
Latitude [NAD83]280415.06
Longitude [NAD83]803846.2
FL State Plane East [NAD83]770271.139
FL State Plane North [NAD83]1358627.998
CountyBrevard
Land Surface Elev. [NGVD29]32
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]2410
Completion Date30-NOV-1999
Hole Diameter
Well OwnerWEST MELBOURNE INJECTION WELL DRILLER: ALSAY INC. [PROSPECT #GN8762.8]
Driller NameWEST MELBOURNE INJECTION WELL DRILLER: ALSAY INC. [PROSPECT #GN8762.8]
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsTOMMY SEAL (6/92-7/92) SEVEN INTERVALS OF CORE ARE 1) 1396-1404; 2) 1572-1575; 3) 1701-1705; 4) 1880-1890; 5) 1917-1920; 6) 1929-1938; 7) 1958-1972. THIS WELL IS DIVIDED INTO TWO PARTS; THIS PART IS 1 OF 2. ENGINEERING REPORT: DRILLING AND TESTING OF THE DEEP INJECTION WELL AND ANNULAR MONITORING TUBE SYSTEM PREPARED FOR THE CITY OF WEST MELBOURNE. TOMMY SEAL (6/92-7/92) SEVEN INTERVALS OF CORE ARE 1) 1396-1404; 2) 1572-1575; 3) 1701-1705; 4) 1880-1890; 5) 1917-1920; 6) 1929-1938; 7) 1958-1972. THIS WELL IS DIVIDED INTO TWO PARTS; THIS PART IS 2 OF 2.



Page generated at: 28-SEP-2024 21:23 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?