DBHYDRO       reports

Construction Details Report

Well NameW-17342
DescriptionSWFWMD/ FGS DRILL CREW: J. MORRILL, J. TRINDELL
Latitude [NAD83]274548.11
Longitude [NAD83]814704.3
FL State Plane East [NAD83]402452.469
FL State Plane North [NAD83]1247483.304
CountyPolk
Land Surface Elev. [NGVD29]121
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]71
Completion Date17-NOV-1995
Hole Diameter
Well OwnerSWFWMD/ FGS DRILL CREW: J. MORRILL, J. TRINDELL
Driller NameSWFWMD/ FGS DRILL CREW: J. MORRILL, J. TRINDELL
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsKEN CAMPBELL (11/95) WELL NAME: FT. MEADE CASING: 4" PVC FROM 0-61' WITH SCREEN FROM 38-58'. PERMEABILITY TEST RUN AT 11.5', 21.3', 33' & 45.7'. FLOW RATES GIVEN ARE MAXIMUM POSSIBLE VALUES. FLOW WAS NOT ACHIEVED FOR ANY SAMPLE WITHIN 31 DAYS. WELL LOCATED AT ROMP 45 SITE. ELEVATION FROM TOPOGRAPHIC MAP. T% IN ACCESSORY MINERALS INDICATES TRACE.



Page generated at: 03-JUL-2024 06:56 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?