DBHYDRO       reports

Construction Details Report

Well NameW-17343
DescriptionSWFWMD/ F.G.S. DRILL CREW: J. MORRILL, J. TRINDELL
Latitude [NAD83]281313.04
Longitude [NAD83]820115.29
FL State Plane East [NAD83]327390.532
FL State Plane North [NAD83]1414178.691
CountyPolk
Land Surface Elev. [NGVD29]118
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]40
Completion Date15-NOV-1995
Hole Diameter
Well OwnerSWFWMD/ F.G.S. DRILL CREW: J. MORRILL, J. TRINDELL
Driller NameSWFWMD/ F.G.S. DRILL CREW: J. MORRILL, J. TRINDELL
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsALEX HOWELL (11/95) WELL NAME: GREEN SWAMP CASING: 4" PVC FROM 0-41' WITH SCREEN FROM 28-38'. CONTINUOUS CORE SAMPLES COLLECTED FROM 0-40'. PERMEABILITY TESTS RUN AT 6.25', 11.5', 18.5', & 26.5'. ALL FLOW RATE VALUES GIVEN ARE MAXIMUM POSSIBLE VALUES. FLOW WAS NOT ACHIEVED IN 31 DAYS. ELEVATION FROM TOPOGRAPHIC MAP. T% IN ACCESSORY MINERALS INDICATES TRACE.



Page generated at: 20-SEP-2024 22:30 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?