DBHYDRO       reports

Construction Details Report

Well NameW-17392
DescriptionSWFWMD ROMP 13/"TIPPEN BAY" (BOB PAUL, INC. PROPERTY)
Latitude [NAD83]270418.19
Longitude [NAD83]813656.28
FL State Plane East [NAD83]455829.186
FL State Plane North [NAD83]995732.389
CountyDesoto
Land Surface Elev. [NGVD29]60
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]2090
Completion Date07-JAN-1982
Hole Diameter
Well OwnerSWFWMD ROMP 13/"TIPPEN BAY" (BOB PAUL, INC. PROPERTY)
Driller NameSWFWMD ROMP 13/"TIPPEN BAY" (BOB PAUL, INC. PROPERTY)
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsTHIS IS MW 5 DOUG RAPPUHN (SWFWMD GEOLOGIST). J. PAT MEADORS (SWFWMD DRILLER): HOLLOW-STEM AUGER, WIRELINE CORING FROM LSD-1544' BLS. THIS SAMPLE DESCRIPTION IS A COMPOSITE OF TWO CLOSELY SPACED BORINGS: (A) HOLLOW-STEM AUGER SAMPLES: 0-49'; (B) WIRELINE CORE: 49-1544' (1994) WIRELINE CORING ACCOMPLISHED USING PLAIN WATER AS DRILLING FLUID, ALLOWING ROUTING POTENTIOMETRIC PROFILING AND WATER SAMPLING DURING THE COURSE OF CORING. DETAILED INFORMATION AVAILABLE FROM SWFWMD GEOHYDROLOGIC DATA SECTION. SURFICIAL AQUIFER: LSD-19' BLS. INTERMEDIATE AQUIFER: 19-665' BLS. UPPER FLORIDAN AQUIFER: 665- REVERSE-AIR DRILLING BY LAYNE DRILLING (CONTRACTED DRILLER) 1579-2075- DRILL CUTTINGS; 2075-2090 4"CORE BARREL. THIS PHASE OF DRILLING WAS TO LOCATE THE SUB-FLORIDAN CONFINING UNIT-(THE EVAPORITES). PREVIOUS DRILLING AT THIS ROMP SITE WAS PERFORMED FROM LAND SURFACE TO 1544 FT. 2050 - 2090 TOP OF EVAPORITES



Page generated at: 04-OCT-2025 10:22 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?