DBHYDRO       reports

Construction Details Report

Well NameW-1976
DescriptionCOASTAL PETROLEUM COMPANY
Latitude [NAD83]250015.47
Longitude [NAD83]803213.22
FL State Plane East [NAD83]809497.273
FL State Plane North [NAD83]244083.18
CountyMonroe
Land Surface Elev. [NGVD29]3
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]7559
Completion Date30-SEP-1949
Hole Diameter
Well OwnerCOASTAL PETROLEUM COMPANY
Driller NameCOASTAL PETROLEUM COMPANY
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsSTEPHEN L. PALMES SAMPLE INTERVAL = 10 FEET THE CONTACT BETWEEN THE SUWANEE LIMESTONE AND THE AVON PARK FORMATION IS PICKED BASED ON A LITHOLOGIC CHANGE FROM A GRAINSTONE/PACKSTONE SEQUENCE (SUWANEE LIMESTONE) TO A MODERATELY RECRYSTALLIZED LIMESTONE/DOLOMITE SEQUENCE. THE LAST OCCURENCE OF DICTYOCONUS AMERICANUS ALSO OCCURS AT THIS HORIZON. THIS WELL IS LOCATED 2 MILES SOUTHWEST OF TAVERNIER ON PLANTATION KEY.



Page generated at: 04-OCT-2025 06:45 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?