DBHYDRO       reports

Construction Details Report

Well NameW-20
DescriptionOWNER: FLORIDA EXPERIMENT STATION DRILLER: GRAY ARTESIAN WELL CO.
Latitude [NAD83]264012.24
Longitude [NAD83]803752.2
FL State Plane East [NAD83]776614.643
FL State Plane North [NAD83]849415.206
CountyPalm Beach
Land Surface Elev. [NGVD29]14
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]1332
Completion Date14-JUL-1926
Hole Diameter
Well OwnerOWNER: FLORIDA EXPERIMENT STATION DRILLER: GRAY ARTESIAN WELL CO.
Driller NameOWNER: FLORIDA EXPERIMENT STATION DRILLER: GRAY ARTESIAN WELL CO.
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsDR. H.S. PURI (9/27/68); CODED AND ENTERED BY JOEL DUNCAN (8/01/89) 1305 FT FROM S LINE AND 1920 FT FROM W LINE, SEC.3; NEAR BELLE GLADE; SALT WATER AT 702 - 910 FT; AT 1332 FT WATER WAS FRESHER;



Page generated at: 28-SEP-2024 18:23 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?