DBHYDRO       reports

Construction Details Report

Well NameW-2073
DescriptionU.S.ARMY CORPS OF ENGINEERS
Latitude [NAD83]261043.311
Longitude [NAD83]801836.18
FL State Plane East [NAD83]882440.247
FL State Plane North [NAD83]671240.918
CountyBroward
Land Surface Elev. [NGVD29]8.1
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]35
Completion Date01-JAN-1949
Hole Diameter
Well OwnerU.S.ARMY CORPS OF ENGINEERS
Driller Name U.S.ARMY CORPS OF ENGINEERS
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsM.P. MEYER; CODED BY RICHARD GREEN (1989) SITE L-35A; HOLE 20; X=726071, Y=670833; ELEV. =8.1' WATER ELEVATION= 8.4' LAT/LONG CORRECTED BY S. CAMPBELL (8/91)



Page generated at: 04-OCT-2025 12:03 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?