DBHYDRO       reports

Construction Details Report

Well NameW-2077
DescriptionU.S. ARMY CORPS OF ENGINEERS
Latitude [NAD83]261208.308
Longitude [NAD83]801759.179
FL State Plane East [NAD83]885764.8
FL State Plane North [NAD83]679840.855
CountyBroward
Land Surface Elev. [NGVD29]8.69
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]31
Completion Date09-JUN-1949
Hole Diameter
Well OwnerU.S. ARMY CORPS OF ENGINEERS
Driller Name U.S. ARMY CORPS OF ENGINEERS
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsM.P. MEYER; CODED BY RICHARD GREEN (1-23-89) X=729610; T=678798; STATION 38+72; SITE L-36, HOLE 4(OLD) LAT/LONG CORRECTED BY S. CAMPBELL (8/91)



Page generated at: 04-OCT-2025 10:24 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?