DBHYDRO       reports

Construction Details Report

Well NameW-2082
DescriptionU.S. ARMY CORPS OF ENGINEERS
Latitude [NAD83]263731.24
Longitude [NAD83]802959.19
FL State Plane East [NAD83]819587.074
FL State Plane North [NAD83]833305.304
CountyPalm Beach
Land Surface Elev. [NGVD29]11
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]35
Completion Date14-MAR-1949
Hole Diameter
Well OwnerU.S. ARMY CORPS OF ENGINEERS
Driller NameU.S. ARMY CORPS OF ENGINEERS
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsU.S.G.S. GEOLOGIST LOG; CODED AND ENTERED BY JOEL DUNCAN (7/31/89) STA. 569+22 (548 FT WEST OF TRAVERSE LINE; L-36; HOLE 44(OLD #16) ELEVATION 11.4' AND TD IS 34.5'; GROUNDWATER LEVEL +9.8' ABOVE MSL; PERMEABILITY:+6.4 - +1.9', 29E -04 CM/SEC; +1.9 - -3.1', 298E -04 CM/SEC; -3.1 - -8.1', 326E -04 CM/SEC; -8.1 - C-13.1', 1.0E -04 CM/SEC; -13.1 - -18.1', 297E -04 CM/SEC;



Page generated at: 04-OCT-2025 10:33 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?