DBHYDRO       reports

Construction Details Report

Well NameW-2083
DescriptionU.S. ARMY CORPS OF ENGINEERS
Latitude [NAD83]260048.333
Longitude [NAD83]802620.19
FL State Plane East [NAD83]840427.145
FL State Plane North [NAD83]610965.814
CountyBroward
Land Surface Elev. [NGVD29]5.69
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]31.59
Completion Date16-DEC-1948
Hole Diameter
Well OwnerU.S. ARMY CORPS OF ENGINEERS
Driller Name U.S. ARMY CORPS OF ENGINEERS
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsGEOLOGIST UNKNOWN; CODED BY RICHARD GREEN (1-24-89) SITE L-37, HOLE 1; X=685530, Y=610899; ELEVATION OF LAND =+5.7; GROUNDWATER ELEV.=+8.2' LAT/LONG CORRECTED BY S. CAMPBELL (8/91)



Page generated at: 04-OCT-2025 05:18 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?