DBHYDRO       reports

Construction Details Report

Well NameW-468
DescriptionU.S.G.S./DURO PUMP AND SOFTENER CO., MIAMI;
Latitude [NAD83]255330.349
Longitude [NAD83]802237.185
FL State Plane East [NAD83]860982.074
FL State Plane North [NAD83]566837.876
CountyMiami-Dade
Land Surface Elev. [NGVD29]8
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]223
Completion Date18-NOV-1940
Hole Diameter
Well OwnerU.S.G.S./DURO PUMP AND SOFTENER CO., MIAMI;
Driller NameU.S.G.S./DURO PUMP AND SOFTENER CO., MIAMI;
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General Comments2375 FT FROM N LINE, 1500 FT FROM E LINE, SEC. 30; AT PENNUSCO, BETWEEN FL. HY. 26 AND THE MIAMI CANAL; DESCRIBED BY GERALD G. PARKER; CODED AND ENTERED BY JOEL DUNCAN 8/3/89; PARKER USES 4.6 FT ELEV. FOR HIS SAMPLE DEPTHS AND FORMATION TOPS AS IN BULLETIN NO.18, PP 102-103, 1944; LITHOLOGIC DESCRIPTIONS(6 CARDS) ADDED TO EXISTING FILE THAT CONTAINED ONLY 1-4 CARDS, LOCATION AND FORMATION TOPS;



Page generated at: 04-OCT-2025 10:11 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?