DBHYDRO       reports

Construction Details Report

Well NameW-4839
DescriptionCENTER, AS NO DETAILS OTHER THAN SECTION ARE GIVEN ON LOCATION.
Latitude [NAD83]262837.3
Longitude [NAD83]813720.6
FL State Plane East [NAD83]452574.056
FL State Plane North [NAD83]779569.261
CountyLee
Land Surface Elev. [NGVD29]30
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]11898
Completion Date19-JUL-2022
Hole Diameter
Well OwnerCENTER, AS NO DETAILS OTHER THAN SECTION ARE GIVEN ON LOCATION.
Driller NameCENTER, AS NO DETAILS OTHER THAN SECTION ARE GIVEN ON LOCATION.
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsCLINT BARINEAU. DESCRIPTION COMPLETED OCTOBER 23, 1998. PICKS FOR SUWANEE, OCALA, AND AVON PARK FORMATION ARE MADE ON BASIS OF FOSSIL DATA, AS NO SIGNIFICANT LITHOLOGIC VARIATION EXISTS BETWEEN THE UNITS IN THIS AREA.



Page generated at: 04-OCT-2025 08:37 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?