Well Name | W-778 |
Description | DRILLER: DURO PUMP & SOFTENER CO. (MIAMI) |
Latitude [NAD83] | 263241.26 |
Longitude [NAD83] | 804251.21 |
FL State Plane East [NAD83] | 749592.308 |
FL State Plane North [NAD83] | 803810.578 |
County | Palm Beach |
Land Surface Elev. [NGVD29] | 13 |
Elevation Source | |
Elevation Error [ft] +/- | |
Land Surface Elev. [NAVD88] | |
Total Depth [FT BLS] | 50 |
Completion Date | 01-JUN-1942 |
Hole Diameter | |
Well Owner | DRILLER: DURO PUMP & SOFTENER CO. (MIAMI) |
Driller Name | DRILLER: DURO PUMP & SOFTENER CO. (MIAMI) |
Drilling Method | |
Construction Comments | |
Construction Date | |
Destroy Date | |
Drilling Comments | |
Development Method | |
Development Hours | |
General Comments | GERALD G. PARKER; CODED AND ENTERED BY JOEL DUNCAN (7/25/89)
52 MILE BEND OF NORTH NEW RIVER CANAL AT A POINT 3.5 MI.SOUTH OF BOLLES
CANAL OFF E. SHOULDER OF FLA. HIGHWAY; |