DBHYDRO       reports

Construction Details Report

Well NameW-778
DescriptionDRILLER: DURO PUMP & SOFTENER CO. (MIAMI)
Latitude [NAD83]263241.26
Longitude [NAD83]804251.21
FL State Plane East [NAD83]749592.308
FL State Plane North [NAD83]803810.578
CountyPalm Beach
Land Surface Elev. [NGVD29]13
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]50
Completion Date01-JUN-1942
Hole Diameter
Well OwnerDRILLER: DURO PUMP & SOFTENER CO. (MIAMI)
Driller NameDRILLER: DURO PUMP & SOFTENER CO. (MIAMI)
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsGERALD G. PARKER; CODED AND ENTERED BY JOEL DUNCAN (7/25/89) 52 MILE BEND OF NORTH NEW RIVER CANAL AT A POINT 3.5 MI.SOUTH OF BOLLES CANAL OFF E. SHOULDER OF FLA. HIGHWAY;



Page generated at: 28-SEP-2024 21:38 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?