DBHYDRO       reports

Construction Details Report

Well NameW-779
DescriptionDURO PUMP & SOFTENER CO. (MIAMI)
Latitude [NAD83]264031.24
Longitude [NAD83]804549.22
FL State Plane East [NAD83]733339.825
FL State Plane North [NAD83]851231.303
CountyPalm Beach
Land Surface Elev. [NGVD29]15
Elevation Source
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]51
Completion Date01-JUN-1942
Hole Diameter
Well OwnerDURO PUMP & SOFTENER CO. (MIAMI)
Driller NameDURO PUMP & SOFTENER CO. (MIAMI)
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsGERALD G. PARKER; CODED AND ENTERED BY JOEL DUNCAN (7/25/89) LOCATED 3 MI. W OF SOUTH BAY & 1 MI. SOUTH OF FLORIDA 25 AT SOUTH SHARE CAMP OF U.S. SUGAR CORP.



Page generated at: 04-OCT-2025 05:18 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?