DBHYDRO       reports

Construction Details Report

Well NameW-8005
DescriptionST. INSTITUTION,
Latitude [NAD83]255434.346
Longitude [NAD83]812151.268
FL State Plane East [NAD83]536439.569
FL State Plane North [NAD83]572979.012
CountyCollier
Land Surface Elev. [NGVD29]3.52
Elevation SourceUSGSTOPO
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]468
Completion Date01-JAN-1966
Hole Diameter
Well OwnerST. INSTITUTION,
Driller NameST. INSTITUTION,
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General CommentsWELL LOCATED IN SE CORNER OF S.R. 29 AND HWY. 41, CARNESTOWN, WORKED BY C.R. SPROUL, 3-28-1967. YIELD 750 GPM, SALTY THIS WAS CODED FROM A GEOLOGIST'S(?) LOG, WHERE POSSIBLE, THE DESCRIPTION IN THE LOG WAS CODED INTO THE LINDQUIST FORMAT, WHERE NOT PRACTICAL, A Z-COMMENT WAS USED FOR THE DESCRIPTION.



Page generated at: 04-OCT-2025 10:21 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?