DBHYDRO
reports
Construction Details Report
Well Name
W-847
Description
U.S.G.S. [L-232]
Latitude [NAD83]
263810.26
Longitude [NAD83]
815056.31
FL State Plane East [NAD83]
378833.77
FL State Plane North [NAD83]
837846.467
County
Lee
Land Surface Elev. [NGVD29]
13.85
Elevation Source
USGSTOPO
Elevation Error [ft] +/-
Land Surface Elev. [NAVD88]
Total Depth [FT BLS]
106
Completion Date
12-JUN-1944
Hole Diameter
Well Owner
U.S.G.S. [L-232]
Driller Name
U.S.G.S. [L-232]
Drilling Method
Construction Comments
Construction Date
Destroy Date
Drilling Comments
Development Method
Development Hours
General Comments
GEOLOGIST UNKNOWN; CODED BY RICHARD GREEN (FROM LOG IN FGS GREEN BOOKS) TEST WELL FT. MEYERS, E. ST CHARLES ST., 42' W OF POWER LINE POLE ON NW CORNER OF INTERSECTION OF ST CHARLES AND BROWN STREETS, 2060' FROM W LINE, 1900' FROM N LINE. WELL CAVED IN TO 10' AFTER BAILING. WATER SAMPLES TAKEN AS FOLLOWS: 1. 6-9-44; 4:15PM, -21.9 'L.S.; 77DEGREES; FROM 1.25" DIAMETER SCREENED WELL DRIVEN 2' N.W. OF 4" TEST WELL. WATER NEVER COMPLETELY CLEARED. PUMPED 30 MIN. AT 2.0 GPM. 2. 6-10-44;12 NOON;-34'LSD; 78DEGREES;BAILER SAMPLE. COULD NOT PUMP AT THIS DEPTH. 3. 6-11-44; 11:30 AM; -80.5' LSD; 78 DEGREES; BAILER SAMPLE COLLECTED AFTER BAILING 15 MIN. AT 10-15GPM. 4. 6-11-44;3:20 PM; -86.5';77 DEGREES ; BAILER SAMPLE. 5. 6-11-44; 4:40 PM; -86.5LSD; 77 DEGREES; AFTER PUMPING 60 MINS. AT 13.8GPM WITH A DRAWDOWN OF 9.51 FEET. 6. 6-12-44; 2:30 PM; -106'; 77 DEGREES; BAILER SAMPLE; COULD NOT PUMP AT THIS DEPTH.
Page generated at: 28-SEP-2024 21:19 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?