DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
NORTH REGIONAL WASTEWATER TREATMENT PLANT
BCN-I1
932265
700323
Start Test Date:
30-MAR-1998 0001
Aquifer:
Test Type:
PACKER
Transmissivity (ft2/day):
11.8
Discharge Rate (gal/min):
Horizontal K (ft/day):
.59
Hours Pumped:
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1640
Storativity:
Tested Interval Max. (ft BLS):
1660
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
MISSIMER INTERNATIONAL, MARCH 1998, CONFINEMENT ANALYSIS, INJECTION WELL SYSTEM, BROWARD COUNTY NORTH REGIONAL WASTEWATER TREATMENT PLANT, POMPANO BEACH, FLORIDA
Comments:
RECOVERY DATA WAS NOT AVAILABLE FOR ALL TESTS, ONLY PUMPING PHASE TEST DATA ENTERED TEST DATE IS DATE OF REPORT COOPER-JACOB METHOD (STRAIGHT LINE)
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
NORTH REGIONAL WASTEWATER TREATMENT PLANT
BCN-I1
932265
700323
Start Test Date:
31-MAR-1998 0005
Aquifer:
Test Type:
PACKER
Transmissivity (ft2/day):
8.94
Discharge Rate (gal/min):
Horizontal K (ft/day):
.45
Hours Pumped:
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1690
Storativity:
Tested Interval Max. (ft BLS):
1710
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
MISSIMER INTERNATIONAL, MARCH 1998, CONFINEMENT ANALYSIS, INJECTION WELL SYSTEM, BROWARD COUNTY NORTH REGIONAL WASTEWATER TREATMENT PLANT, POMPANO BEACH, FLORIDA
Comments:
RECOVERY DATA WAS NOT AVAILABLE FOR ALL TESTS, ONLY PUMPING PHASE TEST DATA ENTERED TEST DATE IS DATE OF REPORT COOPER-JACOB METHOD (STRAIGHT LINE)
Page generated at: 27-SEP-2024 21:23 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?