DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
NORTH REGIONAL WASTEWATER TREATMENT PLANT
BCN-I6
932273
702403
Start Test Date:
01-JAN-2000 0000
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
4.2
Discharge Rate (gal/min):
25
Horizontal K (ft/day):
.28
Hours Pumped:
4.82
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1776
Storativity:
Tested Interval Max. (ft BLS):
1790
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
HAZEN AND SAWYER, JULY, 2000; WELL COMPLETION REPORT, INJECTION WELLS 5 AND 6 CONSTRUCTION COMPLETION REPORT NORTH REGIONAL WASTEWATER TREATMENT PLANT
Comments:
TRANSMISSIVITY AND HORIZONTAL K ARE BOTH FROM RECOVERY.
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
NORTH REGIONAL WASTEWATER TREATMENT PLANT
BCN-I6
932273
702403
Start Test Date:
01-JAN-2000 0001
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
1.22
Discharge Rate (gal/min):
8
Horizontal K (ft/day):
.14
Hours Pumped:
2.42
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1791
Storativity:
Tested Interval Max. (ft BLS):
1805
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
HAZEN AND SAWYER, JULY, 2000; WELL COMPLETION REPORT, INJECTION WELLS 5 AND 6 CONSTRUCTION COMPLETION REPORT NORTH REGIONAL WASTEWATER TREATMENT PLANT
Comments:
TRANSMISSIVITY AND HORIZONTAL K ARE BOTH FROM RECOVERY.
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
NORTH REGIONAL WASTEWATER TREATMENT PLANT
BCN-I6
932273
702403
Start Test Date:
01-JAN-2000 0002
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
13.1
Discharge Rate (gal/min):
48
Horizontal K (ft/day):
.91
Hours Pumped:
4.8
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1816
Storativity:
Tested Interval Max. (ft BLS):
1830
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
HAZEN AND SAWYER, JULY, 2000; WELL COMPLETION REPORT, INJECTION WELLS 5 AND 6 CONSTRUCTION COMPLETION REPORT NORTH REGIONAL WASTEWATER TREATMENT PLANT
Comments:
TRANSMISSIVITY AND HORIZONTAL K ARE BOTH FROM RECOVERY.
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
NORTH REGIONAL WASTEWATER TREATMENT PLANT
BCN-I6
932273
702403
Start Test Date:
01-JAN-2000 0003
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
1.49
Discharge Rate (gal/min):
9
Horizontal K (ft/day):
.088
Hours Pumped:
5.67
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1882
Storativity:
Tested Interval Max. (ft BLS):
1900
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
HAZEN AND SAWYER, JULY, 2000; WELL COMPLETION REPORT, INJECTION WELLS 5 AND 6 CONSTUCTION AND COMPLETION REPORT NORTH REGIONAL WASTEWATER TREATMENT PLANT
Comments:
TRANSMISSIVITY AND HORIZONTAL K ARE BOTH FROM RECOVERY.
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
NORTH REGIONAL WASTEWATER TREATMENT PLANT
BCN-I6
932273
702403
Start Test Date:
01-JAN-2000 0004
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
9.21
Discharge Rate (gal/min):
41
Horizontal K (ft/day):
.23
Hours Pumped:
7.58
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1920
Storativity:
Tested Interval Max. (ft BLS):
1960
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
HAZEN AND SAWYER, JULY, 2000; WELL COMPLETION REPORT, INJECTION WELLS 5 AND 6 CONSTRUCTION AND COMPLETION REPORT NORTH REGIONAL WASTEWATER TREATMENT PLANT
Comments:
TRANSMISSIVITY AND HORIZONTAL K ARE BOTH FROM RECOVERY.
Page generated at: 04-OCT-2025 11:47 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?