DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
BIG CYPRESS SEMINOLE RES. PWS WELLFIELDBCSR-PWS3664506719966

Start Test Date:09-APR-2003 2300Aquifer:LOWER TAMIAMI AQUIFER
Test Type:APTTransmissivity (ft2/day):69531
Discharge Rate (gal/min):500Horizontal K (ft/day):
Hours Pumped:22Vertical K (ft/day):
Tested Interval Min. (ft BLS):85Storativity:
Tested Interval Max. (ft BLS):110Leakance (1/day):
No. Monitored Wells:1Specific Capacity (gpm/ft):200
SourceReferenceCitation Id
CONSULTANT ENSR INTERNATIONAL, JUNE 2003. WELLFIELD EXPANSION: BIG CYPRESS SEMINOLE RESERVATION, FL. WELL CONSTRUCTION AND TESTING REPORT.57
Comments:SINGLE WELL TEST, 2 OTHER WELLS TESTED INDPENDENTLY RANGING FROM 42,434 - 78,715 FT2/D BUT THIS ONE HAD THE BEST FIT TO THE ANALYTICAL SOLUTION.



SitePumped WellX-Coord(ft)Y-Coord (ft)
BIG CYPRESS SEMINOLE RES. PWS WELLFIELDBCSR-PWS3664506719966

Start Test Date:Aquifer:LOWER TAMIAMI AQUIFER
Test Type:STEP-DRAWDOWNTransmissivity (ft2/day):
Discharge Rate (gal/min):1000Horizontal K (ft/day):
Hours Pumped:Vertical K (ft/day):
Tested Interval Min. (ft BLS):85Storativity:
Tested Interval Max. (ft BLS):110Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):177.6
SourceReferenceCitation Id
CONSULTANT 57
Comments:Last step of step drawdown test

Page generated at: 04-OCT-2025 10:15 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?