DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
BELLE GLADE FAS WELLFIELD AT PAUL RARDIN PARK
BGTP-1
759842
877797
Start Test Date:
20-MAR-2005 0000
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
APT
Transmissivity (ft2/day):
15854
Discharge Rate (gal/min):
1432
Horizontal K (ft/day):
Hours Pumped:
72
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1150
Storativity:
.00011
Tested Interval Max. (ft BLS):
1450
Leakance (1/day):
.002
No. Monitored Wells:
1
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
CDM, MAY, 2005. PALM BEACH COUNTY WATER UTILITIES DEPARTMENT PAUL RARDIN PARK TEST PRODUCTION WELLS TP-1 & TP-2 COMPLETION REPORT.
Comments:
TEST WAS CONDUCTED POST ACIDIFICATION OF THE WELLS. THE MONITOR WELL, TP-2, WAS ALSO PUMPED AT A CONSTANT RATE OF 50 GPM DURING THE TEST. RESULTS ARE BASED ON HANTUSH & JACOB (1955) METHOD FOR A LEAKY CONFINED AQUIFER. SALINITY FROM THE TESTED INTERVAL ~ 2,500 MG/L TDS.
Page generated at: 04-OCT-2025 10:16 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?