DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
Bradenton WWTD Injection WellBRADENTONI1100611142638

Start Test Date:25-DEC-2000 0000Aquifer:AVON-PARK PERMEABLE ZONE
Test Type:STEP-DRAWDOWNTransmissivity (ft2/day):280749
Discharge Rate (gal/min):Horizontal K (ft/day):
Hours Pumped:12Vertical K (ft/day):
Tested Interval Min. (ft BLS):1067Storativity:
Tested Interval Max. (ft BLS):1659Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
SOUTHWEST FLORIDA WMD Data compiled by the SWFMWD, originally from , CH2M Hill, 1989.
Comments:T value was from a step-drawdown test (4 steps increasing from 2,000 to 11,800 gpm); drawdown was corrected for friction and formation losses.:Tested Formation -AP



SitePumped WellX-Coord(ft)Y-Coord (ft)
Bradenton WWTD Injection WellBRADENTONI1100611142638

Start Test Date:25-DEC-2000 0000Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):7.75
Discharge Rate (gal/min):Horizontal K (ft/day):
Hours Pumped:Vertical K (ft/day):
Tested Interval Min. (ft BLS):Storativity:
Tested Interval Max. (ft BLS):1017Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
SOUTHWEST FLORIDA WMD Data compiled by the SWFMWD, originally from , CH2M Hill, 1989.
Comments:Low T is representative of tight zone between the lower Ocala and Upper Avon Park. T is an average value of 4 packer tests at various intervals between 820' and 1,017'. Pumping rate varied from 1.5 to 40 gpm.:Tested Formation -Oc

Page generated at: 04-OCT-2025 03:55 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?