DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTP
CCUD-IW1
885052
627683
Start Test Date:
01-JAN-0001 0000
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
Discharge Rate (gal/min):
Horizontal K (ft/day):
Hours Pumped:
4
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1660
Storativity:
Tested Interval Max. (ft BLS):
1710
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
HAZEN AND SAWYER, NOVEMBER, 2001; WELL COMPLETION REPORT, INJECTION WELL NO.1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT, NOVEMBER 2001
Comments:
WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: 0.57 MG/L CHLORIDE: 2400 MG/L CONDUCTIVITY: 7190 UMHOS/CM TOTAL KJELDAHL NITROGEN: 0.74 MG/L TDS: 5170 MG/L
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTP
CCUD-IW1
885052
627683
Start Test Date:
01-JAN-0001 0001
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
Discharge Rate (gal/min):
Horizontal K (ft/day):
Hours Pumped:
4.07
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1763
Storativity:
Tested Interval Max. (ft BLS):
1779
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
HAZEN AND SAWYER, NOVEMBER, 2001; WELL COMPLETION REPORT, INJECTION WELL NO.1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT.
Comments:
WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: 0.57 MG/L CHLORIDE: 6000 MG/L CONDUCTIVITY: 42800 UMHOS/CM TOTAL KJELDAHL NITROGEN: MG/L SULFATE: 365 MG/L TDS: 10800 MG/L CHLORIDE:
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTP
CCUD-IW1
885052
627683
Start Test Date:
01-JAN-0001 0002
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
Discharge Rate (gal/min):
Horizontal K (ft/day):
Hours Pumped:
4.02
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1800
Storativity:
Tested Interval Max. (ft BLS):
1850
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
HAZEN AND SAWYER, NOVEMBER, 2001; INJECTION WELL NO. 1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT.
Comments:
WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: 0.68 MG/L CHLORIDE: 10500 MG/L CONDUCTIVITY: 27500 UMHOS/CM TOTAL KJELDAHL NITROGEN: <0.05 MG/L SULFATE: 370 MG/L
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTP
CCUD-IW1
885052
627683
Start Test Date:
01-JAN-0001 0003
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
Discharge Rate (gal/min):
Horizontal K (ft/day):
Hours Pumped:
4
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1900
Storativity:
Tested Interval Max. (ft BLS):
1950
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
HAZEN AND SAWYER, NOVEMBER, 2001; INJECTION WELL NO.1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT.
Comments:
WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: 0.5 MG/L CHLORIDE: 15500 MG/L CONDUCTIVITY: 38200 UMHOS/CM TOTAL KJELDAHL NITROGEN: 0.82 MG/L SULFATE: 680 MG/L TDS: 27400 MG/L
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTP
CCUD-IW1
885052
627683
Start Test Date:
01-JAN-0001 0004
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
Discharge Rate (gal/min):
Horizontal K (ft/day):
Hours Pumped:
4
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1950
Storativity:
Tested Interval Max. (ft BLS):
1966
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
HAZEN AND SAWYER, NOVEMBER, 2001; WELL COMPLETION REPORT, INJECTION WELL NO.1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT.
Comments:
WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: <0.05 CHLORIDE: 17200 MG/L CONDUCTIVITY: 42200 UMHOS/CM TOTAL KJELDAHL NITROGEN: <0.05 MG/L SULFATE: 950 MG/L TDS: 31400 MG/L
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTP
CCUD-IW1
885052
627683
Start Test Date:
01-JAN-0001 0005
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
2.79
Discharge Rate (gal/min):
9
Horizontal K (ft/day):
.1701
Hours Pumped:
4
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2269
Storativity:
Tested Interval Max. (ft BLS):
2285
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
AHZEN AND SAWYER, NOVEMBER, 2001; WELL COMPLETION REPORT, INJECTION WELL NO.1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT.
Comments:
HORIZONTAL K AND TRANSMISSIVITY ARE FROM RECOVERY. DRAWDOWN HORIZONTAL K: 0.2636 FT/D DRAWDOWN TRANSMISSIVITY: 31.8 GPD/FT WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: 0.52 CHLORIDE: 20500 CONDUCTIVITY: 42800 UMHOS/CM TOTAL KJELDAHL NITROGEN: 0.69 MG/L SULFATE: 2490 MG/L TDS: 32300
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTP
CCUD-IW1
885052
627683
Start Test Date:
01-JAN-0001 0006
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
2.79
Discharge Rate (gal/min):
19
Horizontal K (ft/day):
.3685
Hours Pumped:
4.03
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2515
Storativity:
Tested Interval Max. (ft BLS):
2531
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
HAZEN AND SAWYER, NOVEMBER, 2001; WELL COMPLETION REPORT; INJECTION WELL NO. 1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT.
Comments:
HORIZONTAL K AND TRANSMISSIVITY ARE FROM RECOVERY. DRAWDOWN TRANSMISSIVITY: 47.7 GPD/FT DRAWDOWN HORIZONTAL K: 0.3969 FT/D WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: 0.05 MG/L CHLORIDE: 20500 MG/L CONDUCTIVITY: 36700 UMHOS/CM TOTAL KJELDAHL NITROGEN: 0.12 MG/L SULFATE: 2660 MG/L TDS: 38450 MG/L
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTP
CCUD-IW1
885052
627683
Start Test Date:
01-JAN-0001 0007
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
3.78
Discharge Rate (gal/min):
18
Horizontal K (ft/day):
.2324
Hours Pumped:
3.98
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2724
Storativity:
Tested Interval Max. (ft BLS):
2740
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
HAZEN AND SAWYER, NOVEMBER, 2001; WELL COMPLETION REPORT, INJECTION WELL NO. 1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT.
Comments:
TRANSMISSIVITY AND HORIZONTAL K ARE FROM RECOVERY. DRAWDOWN TRANSMISSIVITY: 31.6 GPD/FT DRAWDOWN HYDRAULIC CONDUCTIVITY: 0.2608 FT/D WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: <0.05 MG/L CHLORIDE: 22000 MG/L CONDUCTIVITY: 36700 UMHOS/CM TOTAL KJELDAHL NITROGEN: 0.13 MG/L SULFATE: 2830 MG/L TDS: 35600 MG/L
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTP
CCUD-IW1
885052
627683
Start Test Date:
01-JAN-0001 0008
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
PACKER
Transmissivity (ft2/day):
5
Discharge Rate (gal/min):
14
Horizontal K (ft/day):
.3118
Hours Pumped:
4.02
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2794
Storativity:
Tested Interval Max. (ft BLS):
2810
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
HAZEN AND SAWYER, NOVEMBER, 2001; WELL COMPLETION REPORT, INJECTION WELL NO.1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT
Comments:
TRANSMISSIVITY AND HORIZONTAL K ARE FROM RECOVERY. DRAWDOWN TRANSMISSIVITY: 37.3 GPD/FT DRAWDOWN HORIZONTAL K: 0.3118 FT/D WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: 0.08 MG/L CHLORIDE: 21000 MG/L CONDUCTIVITY: 36200 UMHOS/CM TOTAL KJELDAHL NITROGEN: 0.11MG/L SULFATE: 2720 MG/L TDS: 35040 MG/L
Page generated at: 04-OCT-2025 10:16 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?