Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTPCCUD-IW1885052627683

Start Test Date:01-JAN-0001 0000Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):
Discharge Rate (gal/min):Horizontal K (ft/day):
Hours Pumped:4Vertical K (ft/day):
Tested Interval Min. (ft BLS):1660Storativity:
Tested Interval Max. (ft BLS):1710Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT HAZEN AND SAWYER, NOVEMBER, 2001; WELL COMPLETION REPORT, INJECTION WELL NO.1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT, NOVEMBER 2001
Comments:WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: 0.57 MG/L CHLORIDE: 2400 MG/L CONDUCTIVITY: 7190 UMHOS/CM TOTAL KJELDAHL NITROGEN: 0.74 MG/L TDS: 5170 MG/L



SitePumped WellX-Coord(ft)Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTPCCUD-IW1885052627683

Start Test Date:01-JAN-0001 0001Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):
Discharge Rate (gal/min):Horizontal K (ft/day):
Hours Pumped:4.07Vertical K (ft/day):
Tested Interval Min. (ft BLS):1763Storativity:
Tested Interval Max. (ft BLS):1779Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT HAZEN AND SAWYER, NOVEMBER, 2001; WELL COMPLETION REPORT, INJECTION WELL NO.1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT.
Comments:WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: 0.57 MG/L CHLORIDE: 6000 MG/L CONDUCTIVITY: 42800 UMHOS/CM TOTAL KJELDAHL NITROGEN: MG/L SULFATE: 365 MG/L TDS: 10800 MG/L CHLORIDE:



SitePumped WellX-Coord(ft)Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTPCCUD-IW1885052627683

Start Test Date:01-JAN-0001 0002Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):
Discharge Rate (gal/min):Horizontal K (ft/day):
Hours Pumped:4.02Vertical K (ft/day):
Tested Interval Min. (ft BLS):1800Storativity:
Tested Interval Max. (ft BLS):1850Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT HAZEN AND SAWYER, NOVEMBER, 2001; INJECTION WELL NO. 1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT.
Comments:WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: 0.68 MG/L CHLORIDE: 10500 MG/L CONDUCTIVITY: 27500 UMHOS/CM TOTAL KJELDAHL NITROGEN: <0.05 MG/L SULFATE: 370 MG/L



SitePumped WellX-Coord(ft)Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTPCCUD-IW1885052627683

Start Test Date:01-JAN-0001 0003Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):
Discharge Rate (gal/min):Horizontal K (ft/day):
Hours Pumped:4Vertical K (ft/day):
Tested Interval Min. (ft BLS):1900Storativity:
Tested Interval Max. (ft BLS):1950Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT HAZEN AND SAWYER, NOVEMBER, 2001; INJECTION WELL NO.1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT.
Comments:WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: 0.5 MG/L CHLORIDE: 15500 MG/L CONDUCTIVITY: 38200 UMHOS/CM TOTAL KJELDAHL NITROGEN: 0.82 MG/L SULFATE: 680 MG/L TDS: 27400 MG/L



SitePumped WellX-Coord(ft)Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTPCCUD-IW1885052627683

Start Test Date:01-JAN-0001 0004Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):
Discharge Rate (gal/min):Horizontal K (ft/day):
Hours Pumped:4Vertical K (ft/day):
Tested Interval Min. (ft BLS):1950Storativity:
Tested Interval Max. (ft BLS):1966Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT HAZEN AND SAWYER, NOVEMBER, 2001; WELL COMPLETION REPORT, INJECTION WELL NO.1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT.
Comments:WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: <0.05 CHLORIDE: 17200 MG/L CONDUCTIVITY: 42200 UMHOS/CM TOTAL KJELDAHL NITROGEN: <0.05 MG/L SULFATE: 950 MG/L TDS: 31400 MG/L



SitePumped WellX-Coord(ft)Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTPCCUD-IW1885052627683

Start Test Date:01-JAN-0001 0005Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):2.79
Discharge Rate (gal/min):9Horizontal K (ft/day):.1701
Hours Pumped:4Vertical K (ft/day):
Tested Interval Min. (ft BLS):2269Storativity:
Tested Interval Max. (ft BLS):2285Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT AHZEN AND SAWYER, NOVEMBER, 2001; WELL COMPLETION REPORT, INJECTION WELL NO.1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT.
Comments:HORIZONTAL K AND TRANSMISSIVITY ARE FROM RECOVERY. DRAWDOWN HORIZONTAL K: 0.2636 FT/D DRAWDOWN TRANSMISSIVITY: 31.8 GPD/FT WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: 0.52 CHLORIDE: 20500 CONDUCTIVITY: 42800 UMHOS/CM TOTAL KJELDAHL NITROGEN: 0.69 MG/L SULFATE: 2490 MG/L TDS: 32300



SitePumped WellX-Coord(ft)Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTPCCUD-IW1885052627683

Start Test Date:01-JAN-0001 0006Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):2.79
Discharge Rate (gal/min):19Horizontal K (ft/day):.3685
Hours Pumped:4.03Vertical K (ft/day):
Tested Interval Min. (ft BLS):2515Storativity:
Tested Interval Max. (ft BLS):2531Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT HAZEN AND SAWYER, NOVEMBER, 2001; WELL COMPLETION REPORT; INJECTION WELL NO. 1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT.
Comments:HORIZONTAL K AND TRANSMISSIVITY ARE FROM RECOVERY. DRAWDOWN TRANSMISSIVITY: 47.7 GPD/FT DRAWDOWN HORIZONTAL K: 0.3969 FT/D WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: 0.05 MG/L CHLORIDE: 20500 MG/L CONDUCTIVITY: 36700 UMHOS/CM TOTAL KJELDAHL NITROGEN: 0.12 MG/L SULFATE: 2660 MG/L TDS: 38450 MG/L



SitePumped WellX-Coord(ft)Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTPCCUD-IW1885052627683

Start Test Date:01-JAN-0001 0007Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):3.78
Discharge Rate (gal/min):18Horizontal K (ft/day):.2324
Hours Pumped:3.98Vertical K (ft/day):
Tested Interval Min. (ft BLS):2724Storativity:
Tested Interval Max. (ft BLS):2740Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT HAZEN AND SAWYER, NOVEMBER, 2001; WELL COMPLETION REPORT, INJECTION WELL NO. 1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT.
Comments:TRANSMISSIVITY AND HORIZONTAL K ARE FROM RECOVERY. DRAWDOWN TRANSMISSIVITY: 31.6 GPD/FT DRAWDOWN HYDRAULIC CONDUCTIVITY: 0.2608 FT/D WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: <0.05 MG/L CHLORIDE: 22000 MG/L CONDUCTIVITY: 36700 UMHOS/CM TOTAL KJELDAHL NITROGEN: 0.13 MG/L SULFATE: 2830 MG/L TDS: 35600 MG/L



SitePumped WellX-Coord(ft)Y-Coord (ft)
COOPER CITY UTILITIES DEPT WATER/WWTPCCUD-IW1885052627683

Start Test Date:01-JAN-0001 0008Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):5
Discharge Rate (gal/min):14Horizontal K (ft/day):.3118
Hours Pumped:4.02Vertical K (ft/day):
Tested Interval Min. (ft BLS):2794Storativity:
Tested Interval Max. (ft BLS):2810Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT HAZEN AND SAWYER, NOVEMBER, 2001; WELL COMPLETION REPORT, INJECTION WELL NO.1 CONSTRUCTION COMPLETION REPORT WATER/WASTEWATER TREATMENT PLANT
Comments:TRANSMISSIVITY AND HORIZONTAL K ARE FROM RECOVERY. DRAWDOWN TRANSMISSIVITY: 37.3 GPD/FT DRAWDOWN HORIZONTAL K: 0.3118 FT/D WATER QUALITY ANALYSIS FROM PACKER TESTS: AMMONIA: 0.08 MG/L CHLORIDE: 21000 MG/L CONDUCTIVITY: 36200 UMHOS/CM TOTAL KJELDAHL NITROGEN: 0.11MG/L SULFATE: 2720 MG/L TDS: 35040 MG/L

Page generated at: 04-OCT-2025 10:16 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?