DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
ROMP 5 Cecil Webb
CH-R5
392979
949943
Start Test Date:
06-JAN-1997 0000
Aquifer:
SANDSTONE AQUIFER
Test Type:
APT
Transmissivity (ft2/day):
1390
Discharge Rate (gal/min):
237
Horizontal K (ft/day):
14
Hours Pumped:
37.5
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
130
Storativity:
.0021
Tested Interval Max. (ft BLS):
230
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
SOUTHWEST FLORIDA WMD
Data compiled by the SWFMWD, originally from , SWFWMD ROMP 5 REPORT, SEPTEMBER 1997: & USGS WRIR 01-4015
Comments:
APT PARAMETERS REPRESENT THE AVERAGE OF THREE ANALYTICAL METHODS.
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
ROMP 5 Cecil Webb
CH-R5
392979
949943
Start Test Date:
13-JAN-1997 0000
Aquifer:
SURFICIAL AQUIFER SYSTEM
Test Type:
APT
Transmissivity (ft2/day):
2780
Discharge Rate (gal/min):
65
Horizontal K (ft/day):
35
Hours Pumped:
64.5
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
5
Storativity:
Tested Interval Max. (ft BLS):
85
Leakance (1/day):
No. Monitored Wells:
1
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
SOUTHWEST FLORIDA WMD
Data compiled by the SWFMWD, originally from , SWFWMD ROMP 5 CECIL WEBB REPORT, SEPTERMBER 1997
Comments:
DATA AFFECTED BY THE RAINFALL EVENT WAS NOT USED TO CALCULATE PARAMETERS. APT PARAMETERS REPRESENT THE AVERAGE OF THREE ANALYTICAL METHODS.
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
ROMP 5 Cecil Webb
CH-R5
392979
949943
Start Test Date:
02-APR-1997 0000
Aquifer:
MID-HAWTHORN AQUIFER
Test Type:
APT
Transmissivity (ft2/day):
2970
Discharge Rate (gal/min):
930
Horizontal K (ft/day):
20
Hours Pumped:
21
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
450
Storativity:
Tested Interval Max. (ft BLS):
600
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
SOUTHWEST FLORIDA WMD
Data compiled by the SWFMWD, originally from , SWFWMD ROMP 5 CECIL WEBB REPORT, SEPTEMBER 1997.
Comments:
NO OBSERVATION WELL WAS AVAILABLE AT THE SITE FOR THIS APT.
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
ROMP 5 Cecil Webb
CH-R5
392979
949943
Start Test Date:
09-APR-1997 0000
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
APT
Transmissivity (ft2/day):
2610
Discharge Rate (gal/min):
349
Horizontal K (ft/day):
10
Hours Pumped:
24
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
720
Storativity:
.408
Tested Interval Max. (ft BLS):
970
Leakance (1/day):
.0018
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
SOUTHWEST FLORIDA WMD
Data compiled by the SWFMWD, originally from , SWFWMD ROMP 5, 1997
Comments:
APT parameters represent the average of three analytical methods. No data correction for regional trends. Intermediate aquifer monitor well declined .7 feet during APT drawdown and recovered to static levels at the end of the recovery test:Tested Formati
Page generated at: 04-OCT-2025 06:44 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?