DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
CLEWISTON RO WELLFIELD
CLEWRO-PW3
678406
875305
Start Test Date:
06-SEP-2007 1100
Aquifer:
UPPER FLORIDAN AQUIFER (UFA)
Test Type:
APT
Transmissivity (ft2/day):
23800
Discharge Rate (gal/min):
1100
Horizontal K (ft/day):
Hours Pumped:
122.83
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
700
Storativity:
.00032
Tested Interval Max. (ft BLS):
1250
Leakance (1/day):
.00034
No. Monitored Wells:
3
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
WATER RESOURCE SOLUTIONS, AQUIFER PERFORMANCE TEST: ANALYSES AND RESULTS OF CITY OF CLISTON, HENDRY COUNTY, FL. NOV. 2007.
Comments:
CORRECTED FOR BAROMETRIC EFFECTS. TEST INDICATES POSSIBILITY OF DIRECTIONAL ANISOTROPY IN PERMEABILITY OF WELLFIELD. FLOW LOGS INDICATE THAT GREATEST PERMEABILITY BETWEEN 700 AND 800 FEET BLS.
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
CLEWISTON RO WELLFIELD
CLEWRO-PW3
678406
875305
Start Test Date:
28-JUN-2006 1015
Aquifer:
UPPER FLORIDAN AQUIFER (UFA)
Test Type:
STEP-DRAWDOWN
Transmissivity (ft2/day):
1151
Discharge Rate (gal/min):
900.00
Horizontal K (ft/day):
Hours Pumped:
.5
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
720
Storativity:
Tested Interval Max. (ft BLS):
1250
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
CDM CITY OF CLEWISTON WATER TREATMENT PLANT PRODUCTION WELLS PW-1 AND PW-2 COMPLETION REPORT
24
Comments:
SPECIFIC CAPACITY = 30 gpm/ft drawdown
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
CLEWISTON RO WELLFIELD
CLEWRO-PW3
678406
875305
Start Test Date:
28-JUN-2006 1130
Aquifer:
UPPER FLORIDAN AQUIFER (UFA)
Test Type:
STEP-DRAWDOWN
Transmissivity (ft2/day):
3119
Discharge Rate (gal/min):
1330.00
Horizontal K (ft/day):
Hours Pumped:
.6
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
720
Storativity:
Tested Interval Max. (ft BLS):
1250
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
CDM CITY OF CLEWISTON WATER TREATMENT PLANT PRODUCTION WELLS PW-1 AND PW-2 COMPLETION REPORT
24
Comments:
SPECIFIC CAPACITY = 29.5 gpm/ft drawdown
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
CLEWISTON RO WELLFIELD
CLEWRO-PW3
678406
875305
Start Test Date:
28-JUN-2006 1245
Aquifer:
UPPER FLORIDAN AQUIFER (UFA)
Test Type:
STEP-DRAWDOWN
Transmissivity (ft2/day):
2252
Discharge Rate (gal/min):
1550.00
Horizontal K (ft/day):
Hours Pumped:
.65
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
720
Storativity:
Tested Interval Max. (ft BLS):
1250
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
CDM CITY OF CLEWISTON WATER TREATMENT PLANT PRODUCTION WELLS PW-1 AND PW-2 COMPLETION REPORT
24
Comments:
SPECIFIC CAPACITY = 29 gpm/ft drawdown
Page generated at: 04-OCT-2025 03:57 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?