DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
CLEWISTON RO WELLFIELDCLEWRO-PW3678406875305

Start Test Date:06-SEP-2007 1100Aquifer:UPPER FLORIDAN AQUIFER (UFA)
Test Type:APTTransmissivity (ft2/day):23800
Discharge Rate (gal/min):1100Horizontal K (ft/day):
Hours Pumped:122.83Vertical K (ft/day):
Tested Interval Min. (ft BLS):700Storativity:.00032
Tested Interval Max. (ft BLS):1250Leakance (1/day):.00034
No. Monitored Wells:3Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT WATER RESOURCE SOLUTIONS, AQUIFER PERFORMANCE TEST: ANALYSES AND RESULTS OF CITY OF CLISTON, HENDRY COUNTY, FL. NOV. 2007.
Comments:CORRECTED FOR BAROMETRIC EFFECTS. TEST INDICATES POSSIBILITY OF DIRECTIONAL ANISOTROPY IN PERMEABILITY OF WELLFIELD. FLOW LOGS INDICATE THAT GREATEST PERMEABILITY BETWEEN 700 AND 800 FEET BLS.



SitePumped WellX-Coord(ft)Y-Coord (ft)
CLEWISTON RO WELLFIELDCLEWRO-PW3678406875305

Start Test Date:28-JUN-2006 1015Aquifer:UPPER FLORIDAN AQUIFER (UFA)
Test Type:STEP-DRAWDOWNTransmissivity (ft2/day):1151
Discharge Rate (gal/min):900.00Horizontal K (ft/day):
Hours Pumped:.5Vertical K (ft/day):
Tested Interval Min. (ft BLS):720Storativity:
Tested Interval Max. (ft BLS):1250Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CDM CITY OF CLEWISTON WATER TREATMENT PLANT PRODUCTION WELLS PW-1 AND PW-2 COMPLETION REPORT24
Comments:SPECIFIC CAPACITY = 30 gpm/ft drawdown



SitePumped WellX-Coord(ft)Y-Coord (ft)
CLEWISTON RO WELLFIELDCLEWRO-PW3678406875305

Start Test Date:28-JUN-2006 1130Aquifer:UPPER FLORIDAN AQUIFER (UFA)
Test Type:STEP-DRAWDOWNTransmissivity (ft2/day):3119
Discharge Rate (gal/min):1330.00Horizontal K (ft/day):
Hours Pumped:.6Vertical K (ft/day):
Tested Interval Min. (ft BLS):720Storativity:
Tested Interval Max. (ft BLS):1250Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CDM CITY OF CLEWISTON WATER TREATMENT PLANT PRODUCTION WELLS PW-1 AND PW-2 COMPLETION REPORT24
Comments:SPECIFIC CAPACITY = 29.5 gpm/ft drawdown



SitePumped WellX-Coord(ft)Y-Coord (ft)
CLEWISTON RO WELLFIELDCLEWRO-PW3678406875305

Start Test Date:28-JUN-2006 1245Aquifer:UPPER FLORIDAN AQUIFER (UFA)
Test Type:STEP-DRAWDOWNTransmissivity (ft2/day):2252
Discharge Rate (gal/min):1550.00Horizontal K (ft/day):
Hours Pumped:.65Vertical K (ft/day):
Tested Interval Min. (ft BLS):720Storativity:
Tested Interval Max. (ft BLS):1250Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CDM CITY OF CLEWISTON WATER TREATMENT PLANT PRODUCTION WELLS PW-1 AND PW-2 COMPLETION REPORT24
Comments:SPECIFIC CAPACITY = 29 gpm/ft drawdown

Page generated at: 04-OCT-2025 03:57 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?