DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
CLEWISTON RO WELLFIELDCLEWRO-PW4679530875649

Start Test Date:07-JUN-2007 1028Aquifer:UPPER FLORIDAN AQUIFER (UFA)
Test Type:STEP-DRAWDOWNTransmissivity (ft2/day):12478
Discharge Rate (gal/min):1700.00Horizontal K (ft/day):
Hours Pumped:.98Vertical K (ft/day):
Tested Interval Min. (ft BLS):730Storativity:
Tested Interval Max. (ft BLS):1250Leakance (1/day):
No. Monitored Wells:0Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CDM CITY OF CLEWISTON WATER TREATMENT PLANT PRODUCTION WELLS PW-1 AND PW-2 COMPLETION REPORT24
Comments:SPECIFIC CAPACITY = 178.95 gpm/ft drawdown



SitePumped WellX-Coord(ft)Y-Coord (ft)
CLEWISTON RO WELLFIELDCLEWRO-PW4679530875649

Start Test Date:08-JUN-2007 0822Aquifer:UPPER FLORIDAN AQUIFER (UFA)
Test Type:STEP-DRAWDOWNTransmissivity (ft2/day):16019
Discharge Rate (gal/min):2400.00Horizontal K (ft/day):
Hours Pumped:7.8Vertical K (ft/day):
Tested Interval Min. (ft BLS):730Storativity:
Tested Interval Max. (ft BLS):1250Leakance (1/day):
No. Monitored Wells:0Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CDM CITY OF CLEWISTON WATER TREATMENT PLANT PRODUCTION WELLS PW-1 AND PW-2 COMPLETION REPORT24
Comments:SPECIFIC CAPACITY = 118.8 gpm/ft drawdown

Page generated at: 04-OCT-2025 10:18 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?