DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
EXPANSION FOR CITY OF HOLLYWOOD WATER SUPPLY SYSTEM
COHWTP_TW
926389
611662
Start Test Date:
31-AUG-1992 0000
Aquifer:
FLORIDAN AQUIFER SYSTEM
Test Type:
APT
Transmissivity (ft2/day):
24390
Discharge Rate (gal/min):
1010
Horizontal K (ft/day):
Hours Pumped:
120
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
930
Storativity:
.0003
Tested Interval Max. (ft BLS):
1314
Leakance (1/day):
.000063
No. Monitored Wells:
1
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
MISSIMER AND ASSOCIATES, INC. OCTOBER 1992. TECHNICAL MEMORANDUM ON THE CONSTRUCTION AND TESTING OF WELL F-2, CITY OF HOLLYWOOD, FLORIDA.
Comments:
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
EXPANSION FOR CITY OF HOLLYWOOD WATER SUPPLY SYSTEM
COHWTP_TW
926389
611662
Start Test Date:
05-DEC-2008 0000
Aquifer:
UPPER FLORIDAN AQUIFER (UFA)
Test Type:
STEP-DRAWDOWN
Transmissivity (ft2/day):
28075
Discharge Rate (gal/min):
Horizontal K (ft/day):
74
Hours Pumped:
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
920
Storativity:
Tested Interval Max. (ft BLS):
1301
Leakance (1/day):
No. Monitored Wells:
0
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
MALCOLM PIRNIE, NSTALLATION OF PRODUCTION WELLS F10 & F13 AND MAINTENANCE OF WELLS F2, F3 & F5. CITY OF HOLLYWOOD, FL- TECHNICAL MEMORANDUMI. MARCH, 2009.
Comments:
TEST CONDUCTED POST ACIDIZATION OF THE WELLBORE TO IMPROVE PERMEABILITY 4 DISCHARGE RATES: 830, 915, 1133 & 1472. T ESTIMATED FROM SPECIFIC CAPACITY
Page generated at: 04-OCT-2025 10:09 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?