DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
FT PIERCE MAINLAND WATER RECLAMATION FACILITY
FPMWRF-IW1
858271
1110138
Start Test Date:
17-MAY-2007 0000
Aquifer:
Test Type:
PACKER
Transmissivity (ft2/day):
8
Discharge Rate (gal/min):
20
Horizontal K (ft/day):
Hours Pumped:
4.1
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1832
Storativity:
Tested Interval Max. (ft BLS):
1850
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
.2
Source
Reference
Citation Id
CONSULTANT
CH2MHILL, 2007. Engineering report on the construction and testing of the industrial injection well IW-1) and dual-zone monitoring well at the proposed Ft Pierce Utilities Authority Mainland Water Reclamation Facility. Vol. 1
Comments:
Analyzed by Theis Recovery method. TDS =13,230 mg/l Max Drawdown [ft] = 107.9
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
FT PIERCE MAINLAND WATER RECLAMATION FACILITY
FPMWRF-IW1
858271
1110138
Start Test Date:
18-MAY-2007 0000
Aquifer:
Test Type:
PACKER
Transmissivity (ft2/day):
8
Discharge Rate (gal/min):
17
Horizontal K (ft/day):
Hours Pumped:
4.3
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
1790
Storativity:
Tested Interval Max. (ft BLS):
1808
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
.2
Source
Reference
Citation Id
CONSULTANT
CH2MHILL, 2007. Engineering report on the construction and testing of the industrial injection well IW-1) and dual-zone monitoring well at the proposed Ft Pierce Utilities Authority Mainland Water Reclamation Facility. Vol. 1
Comments:
Analyzed by Theis Recovery method. TDS = 5380 mg/l Max Drawdown [ft] = 105.1
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
FT PIERCE MAINLAND WATER RECLAMATION FACILITY
FPMWRF-IW1
858271
1110138
Start Test Date:
17-JUL-2007 0000
Aquifer:
Test Type:
PACKER
Transmissivity (ft2/day):
2
Discharge Rate (gal/min):
3.7
Horizontal K (ft/day):
Hours Pumped:
25.6
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2863
Storativity:
Tested Interval Max. (ft BLS):
2881
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
.06
Source
Reference
Citation Id
CONSULTANT
CH2MHILL, 2007. Engineering report on the construction and testing of the industrial injection well IW-1) and dual-zone monitoring well at the proposed Ft Pierce Utilities Authority Mainland Water Reclamation Facility. Vol. 1
Comments:
Analyzed by Theis Recovery method Max Drawdown [ft] = 64.2
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
FT PIERCE MAINLAND WATER RECLAMATION FACILITY
FPMWRF-IW1
858271
1110138
Start Test Date:
21-JUL-2007 0000
Aquifer:
Test Type:
PACKER
Transmissivity (ft2/day):
2
Discharge Rate (gal/min):
5.4
Horizontal K (ft/day):
Hours Pumped:
6
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2731
Storativity:
Tested Interval Max. (ft BLS):
2759
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
.1
Source
Reference
Citation Id
CONSULTANT
CH2MHILL, 2007. Engineering report on the construction and testing of the industrial injection well IW-1) and dual-zone monitoring well at the proposed Ft Pierce Utilities Authority Mainland Water Reclamation Facility. Vol. 1
Comments:
Analyzed by Theis Recovery method Max Drawdown [ft] = 62.2
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
FT PIERCE MAINLAND WATER RECLAMATION FACILITY
FPMWRF-IW1
858271
1110138
Start Test Date:
23-JUL-2007 0000
Aquifer:
Test Type:
PACKER
Transmissivity (ft2/day):
Discharge Rate (gal/min):
0.2
Horizontal K (ft/day):
Hours Pumped:
51.3
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2251
Storativity:
Tested Interval Max. (ft BLS):
2279
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
0
Source
Reference
Citation Id
CONSULTANT
CH2MHILL, 2007. Engineering report on the construction and testing of the industrial injection well IW-1) and dual-zone monitoring well at the proposed Ft Pierce Utilities Authority Mainland Water Reclamation Facility. Vol. 1
Comments:
Hydraulic properties not determined Max Drawdown [ft] = 85.9
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
FT PIERCE MAINLAND WATER RECLAMATION FACILITY
FPMWRF-IW1
858271
1110138
Start Test Date:
26-JUL-2007 0000
Aquifer:
Test Type:
PACKER
Transmissivity (ft2/day):
Discharge Rate (gal/min):
0.2
Horizontal K (ft/day):
Hours Pumped:
27.4
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2511
Storativity:
Tested Interval Max. (ft BLS):
2539
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
0
Source
Reference
Citation Id
CONSULTANT
CH2MHILL, 2007. Engineering report on the construction and testing of the industrial injection well IW-1) and dual-zone monitoring well at the proposed Ft Pierce Utilities Authority Mainland Water Reclamation Facility. Vol. 1
Comments:
Hydraulic properties not determined Max Drawdown [ft] = 49.1
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
FT PIERCE MAINLAND WATER RECLAMATION FACILITY
FPMWRF-IW1
858271
1110138
Start Test Date:
27-JUL-2007 0000
Aquifer:
Test Type:
PACKER
Transmissivity (ft2/day):
1
Discharge Rate (gal/min):
2.3
Horizontal K (ft/day):
Hours Pumped:
36.2
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2471
Storativity:
Tested Interval Max. (ft BLS):
2499
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
0
Source
Reference
Citation Id
CONSULTANT
CH2MHILL, 2007. Engineering report on the construction and testing of the industrial injection well IW-1) and dual-zone monitoring well at the proposed Ft Pierce Utilities Authority Mainland Water Reclamation Facility. Vol. 1
Comments:
Analyzed by Theis Recovery method Max Drawdown [ft] = 84.6
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
FT PIERCE MAINLAND WATER RECLAMATION FACILITY
FPMWRF-IW1
858271
1110138
Start Test Date:
30-JUL-2007 0000
Aquifer:
Test Type:
PACKER
Transmissivity (ft2/day):
18
Discharge Rate (gal/min):
21
Horizontal K (ft/day):
Hours Pumped:
11.1
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
2673
Storativity:
Tested Interval Max. (ft BLS):
2731
Leakance (1/day):
No. Monitored Wells:
Specific Capacity (gpm/ft):
.4
Source
Reference
Citation Id
CONSULTANT
CH2MHILL, 2007. Engineering report on the construction and testing of the industrial injection well IW-1) and dual-zone monitoring well at the proposed Ft Pierce Utilities Authority Mainland Water Reclamation Facility. Vol. 1
Comments:
Analyzed by Theis Recovery method Max Drawdown [ft] = 55
Page generated at: 04-OCT-2025 10:17 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?