DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
FT. MYERS REVERSE OSMOSIS WATER TREATMENT PLANTFTM-P13389739835331

Start Test Date:03-NOV-2007 0543Aquifer:UPPER FLORIDAN AQUIFER (UFA)
Test Type:STEP-DRAWDOWNTransmissivity (ft2/day):2017
Discharge Rate (gal/min):600.00Horizontal K (ft/day):
Hours Pumped:5.33Vertical K (ft/day):
Tested Interval Min. (ft BLS):580Storativity:
Tested Interval Max. (ft BLS):700Leakance (1/day):
No. Monitored Wells:0Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL. 2007. ENGINEERING REPORT ON THE CONTRUCTION OF WELLS P-13 THROUGH P-17, FORT MYERS FLORIDA.
Comments:TRANS IS FROM CJ USING RECOVERY DATA

Page generated at: 01-JUL-2024 07:54 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?