DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
FT. MYERS REVERSE OSMOSIS WATER TREATMENT PLANTFTM-P15390955834085

Start Test Date:11-JUN-2007 0947Aquifer:UPPER FLORIDAN AQUIFER (UFA)
Test Type:STEP-DRAWDOWNTransmissivity (ft2/day):7230
Discharge Rate (gal/min):635.00Horizontal K (ft/day):
Hours Pumped:4.38Vertical K (ft/day):
Tested Interval Min. (ft BLS):490Storativity:
Tested Interval Max. (ft BLS):680Leakance (1/day):
No. Monitored Wells:0Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL. 2007. ENGINEERING REPORT ON THE CONTRUCTION OF WELLS P-13 THROUGH P-17, FORT MYERS FLORIDA.44
Comments:TRANS IS FROM CJ USING RECOVERY DATA

Page generated at: 04-OCT-2025 03:56 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?