DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
FT. MYERS REVERSE OSMOSIS WATER TREATMENT PLANTFTM_RO-P1386485835074

Start Test Date:05-MAR-1998 0000Aquifer:UPPER FLORIDAN AQUIFER (UFA)
Test Type:PACKERTransmissivity (ft2/day):1500
Discharge Rate (gal/min):85Horizontal K (ft/day):4
Hours Pumped:Vertical K (ft/day):
Tested Interval Min. (ft BLS):776Storativity:
Tested Interval Max. (ft BLS):1150Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2MHILL, JUNE 1998. ENGINEERING REPORT ON THE CONSTRUCTION AND TESTING OF ARTESIAN TEST PRODUCTION WELL TP-1. FT MYERS, FL.
Comments:SINGLE WELL TEST. ANALYSIS BASED ON RECOVERY DATA ONLY.

Page generated at: 04-OCT-2025 06:39 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?