DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
FT. MYERS REVERSE OSMOSIS WATER TREATMENT PLANTFTM_RO-P3387001834002

Start Test Date:02-NOV-2000 0000Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:APTTransmissivity (ft2/day):8045
Discharge Rate (gal/min):2150Horizontal K (ft/day):
Hours Pumped:24Vertical K (ft/day):
Tested Interval Min. (ft BLS):510Storativity:.0002
Tested Interval Max. (ft BLS):837Leakance (1/day):.0011
No. Monitored Wells:2Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL, MARCH 2001, CONSTRUCTION AND TESTING OF PROD. WELLS P-3 THROUGH P-7, FT. MYERS, FL
Comments:TRANSMISSIVITY, STORATIVITY AND LEAKANCE VALUES ARE AVERAGES OF CJ AND THEIS AND THEIS RECOVERY METHODS



SitePumped WellX-Coord(ft)Y-Coord (ft)
FT. MYERS REVERSE OSMOSIS WATER TREATMENT PLANTFTM_RO-P3387001834002

Start Test Date:25-DEC-2000 0000Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:PACKERTransmissivity (ft2/day):
Discharge Rate (gal/min):8Horizontal K (ft/day):
Hours Pumped:4Vertical K (ft/day):
Tested Interval Min. (ft BLS):820Storativity:
Tested Interval Max. (ft BLS):894Leakance (1/day):
No. Monitored Wells:Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL, CONSTRUCTION AND TESTING OF PROD. WELLS P-3 THROUGH P-7, FT. MYERS, FL, MARCH 2001
Comments:

Page generated at: 28-SEP-2024 21:22 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?