DBHYDRO       reports

Hydraulic Details

SitePumped WellX-Coord(ft)Y-Coord (ft)
FT. MYERS REVERSE OSMOSIS WATER TREATMENT PLANTFTM_RO-P7386901829202

Start Test Date:26-OCT-2000 0000Aquifer:FLORIDAN AQUIFER SYSTEM
Test Type:APTTransmissivity (ft2/day):21170
Discharge Rate (gal/min):2300Horizontal K (ft/day):60
Hours Pumped:24Vertical K (ft/day):
Tested Interval Min. (ft BLS):445Storativity:.00047
Tested Interval Max. (ft BLS):800Leakance (1/day):.005
No. Monitored Wells:2Specific Capacity (gpm/ft):
SourceReferenceCitation Id
CONSULTANT CH2M HILL, MARCH 2001, CONSTRUCTION AND TESTING OF PROD. WELLS P-3 THROUGH P-7, FT. MYERS, FL
Comments:TRANSMISSIVITY, STORATIVITY AND LEAKANCE ARE AVERAGES OF CJ, THEIS AND THEIS RECOVERY METHODS. PUMPED FAILED 30 MINUTES BEFORE PLANNED RECOVERY. RECOVERY BEGAN AS WELL FLOWED FOR ~20 MINUTES BEFORE WELL WAS CLOSED IN.

Page generated at: 01-JUL-2024 07:37 EDT

DBHYDRO Menu  |   DBHYDRO Home  |   SFWMD Home  |   User's Guide  |   What's New  |   FAQ |  Comments?