DBHYDRO
reports
Hydraulic Details
Site
Pumped Well
X-Coord(ft)
Y-Coord (ft)
USSC SO. DIV. RANCH II
H-M-301
671956
740682
Start Test Date:
06-NOV-1986 0000
Aquifer:
LOWER TAMIAMI AQUIFER
Test Type:
APT
Transmissivity (ft2/day):
43449
Discharge Rate (gal/min):
831
Horizontal K (ft/day):
905
Hours Pumped:
72
Vertical K (ft/day):
Tested Interval Min. (ft BLS):
76
Storativity:
.0004
Tested Interval Max. (ft BLS):
124
Leakance (1/day):
.00027
No. Monitored Wells:
Specific Capacity (gpm/ft):
Source
Reference
Citation Id
CONSULTANT
Missimer and Associates, 1987 partial report, title unknown,and APT analyses
Comments:
No lithologic log, only well construction info.
Well Name
X Coord(ft)
Y Coord(ft)
Analysis Method
DistancefromProductionWell(ft)
Max.Drawdown(ft)
Transmissivity(ft**2/day)
Storativity
Leakance
H-M-302
672084
740682
HANTUSH-JACOB (1955)
127
2.82
42781
.00034
.000017
H-M-303
668964
759791
HANTUSH-JACOB (1955)
397
2.17
44118
.00026
.000013
H-M-309
668964
759791
HANTUSH-JACOB (1955)
1540
1.43
44118
.0008
.00019
Page generated at: 04-OCT-2025 10:24 EDT
DBHYDRO Menu
|
DBHYDRO Home
|
SFWMD Home
|
User's Guide
|
What's New
|
FAQ
|
Comments?